917.01 Permits plus diagram of project required before work is started.
917.02 Supervision, inspection required.
917.03 Connections; curb cuts; splash block prohibited.
917.04 Position of dry well and method of construction.
917.05 Method of installing storm drains.
917.99 Penalty.
CROSS REFERENCES
Littering and deposit of garbage, rubbish, etc. - see GEN. OFF. 521.08
Surface drainage connections to sanitary sewers prohibited - see S.U. & P.S. 933.03