The natural ground surface shall be prepared to receive fill by removing vegetation, non-complying fill, unsuitable soil, and, where slopes are five horizontal to one vertical or steeper, by benching into material approved by the soil engineer.
(Added by Ord. No. 9547 (N.S.), effective 5-9-03)