In addition to conforming to the requirements of the SMA and this division a parcel map shall comply with all requirements and conditions of the approved or conditionally approved tentative parcel map.
In determining whether the parcel map complies with the approved tentative parcel map, project change(s) required to comply with changes in State or Federal regulatory requirements shall be provided a 10 percent change allowance in addition to the substantial conformance determination if all of the following are met:
(a) It shall be determined that the project change(s) do not result in a new or substantially increased significant impact in accordance with the California Environmental Quality Act (CEQA).
(b) It shall be determined that the project change(s) do not result in the creation of a situation that would be detrimental to the health, safety, or welfare of the public.
(c) It shall be determined that the project change(s) do not result in the elimination of project features required to meet other County of San Diego code requirements, including, but not limited to, the following:
(1) Elimination of a trail that provides a connection through the project that is needed for regional connectivity.
(2) Reduction in the overall amount of parkland approved with the original project.
(3) Elimination of roads that are needed for emergency access, travel time, or to handle the traffic generated by the project.
(4) Reduction of area needed for required water supply well or onsite wastewater treatment system and reserve area.
(Amended by Ord. No. 5406 (N.S.), effective 3-22-79, operative 3-23-79; amended by Ord. No. 8426 (N.S.), effective 8-19-94; amended by Ord. No. 9227 (N.S.), effective 7-21-00; amended by Ord. No. 10037 (N.S.), effective 3-26-10; amended by Ord. No. 10744 (N.S.), effective 10-1-21)