A permittee whose on-site wastewater treatment system installation, rebuild, repair or addition does not pass inspection shall promptly correct the deficiency in the system and have the system reinspected. If the permittee fails to correct the deficiency or request reinspection within a reasonable period of time, the Director may revoke the permit.
(Amended by Ord. No. 3061 (N.S.), effective 5-11-67; amended by Ord. No. 3436 (N.S.), effective 1-1-70; amended by Ord. No. 4531 (N.S.), effective 7-31-75; amended by Ord. No. 5847 (N.S.), effective 9-11-80; amended by Ord. No. 7428 (N.S.), effective 2-4-88; amended by Ord. No. 9273 (N.S.), effective 12-15-00; amended by Ord. No. 10136 (N.S.), effective 4-15-11)