There shall be no physical connection between the potable water supply and the recycled water supply, whereby the potable supply could become contaminated. Each special purpose district may appoint a water supervisor, knowledgeable about plumbing and cross connection control, to monitor construction and operation of the on-site and off-site facility distribution system(s). If the special purpose district serving a facility has no water supervisor, the owner or operator of the facility shall appoint a water supervisor to monitor construction and operation of the on-site facility distribution system(s). The Administrator shall review recycled water distribution system plans and recycled water irrigation system plans for cross-connections. This includes an initial cross-connection control site inspection and an annual cross-connection control inspection of sites having both recycled and potable water systems.
(Added by Ord. No. 7737 (N.S.), effective 4-26-90; repealed and added by Ord. No. 8222 (N.S.), effective 4-29-93; amended by Ord. No. 9273 (N.S.), effective 12-15-00)