SECTION R703 EXTERIOR COVERING
Pursuant to the UCC, delete Section R703.7 and replace as follows:
R-R703.7 Exterior plaster (stucco). Installation of exterior plaster shall be in compliance with ASTM C926-2018B, ASTM C1063-2018B and the provisions of this code.
   R-R703.7.1 Lath. Lath and lath attachments shall be of corrosion-resistant materials in accordance with ASTM C1063-2018B. Expanded metal, welded wire, or woven wire lath shall be attached to wood framing members or furring. Where the exterior plaster is serving as wall bracing in accordance with Table R602.10.1 of the 2006 IRC, the lath shall be attached directly to framing. The lath shall be attached with 1-1/2-inch-long (38 mm), 11-gage nails having a 7/16-inch (11.1 mm) head, or 7/8-inch-long (22.2 mm), 16-gage staples, spaced not more than 7 inches (178 mm) on center along framing members or furring and not more than 24 inches (610 mm) on center between framing members or furring, or as otherwise approved. Additional fastening between wood framing members shall not be prohibited. Lath attachments to cold formed steel framing or to masonry, stone, or concrete substrates shall be in accordance with ASTM C1063-2018B. Where lath is installed directly over foam sheathing, lath connections shall also be in accordance with Section R703.15, R703.16 or R703.17. Where lath is attached to furring installed over foam sheathing, the furring connections shall be in accordance with Section R703.15, R703.16 or R703.17.
   Exception: Lath is not required over masonry, cast-in-place concrete, precast concrete or stone substrates prepared in accordance with ASTM C1063-2018B.
      R-R703.7.1.1 Furring. Where provided, furring shall consist of wood furring strips not less than 1 inch by 2 inches (25 mm by 51 mm), minimum 3/4-inch (19 mm) metal channels, or self-furring lath, and shall be installed in accordance with ASTM C1063-2018B. Furring shall be spaced not greater than 24 inches (600 mm) on center and, where installed over wood or cold-formed steel framing, shall be fastened into framing members.
   R-R703.7.2 Plaster. Plastering with cement plaster shall be in accordance with ASTM C926-2018B. Cement materials shall be in accordance with one of the following:
      1.   Masonry cement conforming to ASTM C91-2018A, Type M, S or N.
      2.   Portland cement conforming to ASTM C150-2018, Type I, II or III.
      3.   Blended hydraulic cement conforming to ASTM C595-2018, Type IP, IS (< 70), IL, or IT (S < 70).
      4.   Hydraulic cement conforming to ASTM C1157-11, Type GU, HE, MS, HS or MH.
      5.   Plastic (stucco) cement conforming to ASTM C1328-12.
      Plaster shall be not less than three coats where applied over metal lath or wire lath and shall be not less than two coats where applied over masonry, concrete, pressure preservative-treated wood or decay-resistant wood as specified in Section R317.1 or gypsum backing. If the plaster surface is completely covered by veneer or other facing material or is completely concealed, plaster application need be only two coats, provided the total thickness is as set forth in Table R702.1(1). On wood-frame construction with an on-grade floor slab system, exterior plaster shall be applied to cover, but not extend below, lath, paper and screed. The proportion of aggregate to cementitious materials shall be as set forth in Table R702.1(3).
      R-R03.7.2.1 Weep Screeds. A minimum 0.019-inch (0.5 mm) (No. 26 galvanized sheet gage), corrosion-resistant weep screed or plastic weep screed, with a minimum vertical attachment flange of 3-1/2 inches (89 mm), shall be provided at or below the foundation plate line on exterior stud walls in accordance with ASTM C926. The weep screed shall be placed not less than 4 inches (102 mm) above the earth or 2 inches (51 mm) above paved areas and shall be of a type that will allow trapped water to drain to the exterior of the building. The weather-resistant barrier shall lap the attachment flange. The exterior lath shall cover and terminate on the attachment flange of the weep screed.
   R-R703.7.3 Water-resistive barriers. Water-resistive barriers shall be installed as required in Section R703.2 and, where applied over wood-based sheathing, shall comply with Section R-R703.7.3.1 or R-R703.7.3.2.
      R-R703.7.3.1 Dry climates. In Dry (B) climate zones indicated in Figure N1101.7, water-resistive barriers shall comply with one of the following:
         1.   The water-resistive barrier shall be two layers of 10-minute Grade D paper or have a water resistance equal to or greater than two layers of a water-resistive barrier complying with ASTM E2556-10, Type I. The individual layers shall be installed independently such that each layer provides a separate continuous plane. Flashing installed in accordance with Section R703.4 and intended to drain to the water-resistive barrier shall be directed between the layers.
         2.   The water-resistive barrier shall be 60-minute Grade D paper or have a water resistance equal to or greater than one layer of a water-resistive barrier complying with ASTM E2556-10, Type II. The water-resistive barrier shall be separated from the stucco by a layer of foam plastic insulating sheathing or other non-water-absorbing layer, or a designed drainage space.
      R-R703.7.3.2 Moist or marine climates. In the Moist (A) or Marine (C) climate zones indicated in Figure N1101.7, water-resistive barriers shall comply with one of the following:
         1.   In addition to complying with Section R-R703.7.3.1, a space or drainage material not less than 3/16 inch (5 mm) in depth shall be added to the exterior side of the water-resistive barrier.
         2.   In addition to complying with Section R-R703.7.3.1, Item 2, drainage on the exterior of the water-resistive barrier shall have a drainage efficiency of not less than 90 percent, as measured in accordance with ASTM E2273-2018 or Annex A2 of ASTM E2925-17.
   R-R703.7.4 Application. Each coat shall be kept in a moist condition for at least 48 hours prior to application of the next coat.
   Exception: Applications installed in accordance with ASTM C926.
   R-R703.7.5 Curing. The finish coat for two-coat cement-plaster shall not be applied sooner than seven days after application of the first coat. For three-coat cement-plaster, the second coat shall not be applied sooner than 48 hours after application of the first coat. The finish coat for three-coat cement-plaster shall not be applied sooner than seven days after application of the second coat.