A-903.2 Electrical permit fees: 272 The permit fee for electrical work shall be twenty-five dollars ($25) for each one thousand dollars ($1,000) or fraction thereof of estimated electrical construction costs. The minimum fee shall be fifty dollars ($50). The maximum fee shall be fifteen thousand dollars ($15,000). Except as provided in Section A-903.2.1, the construction costs shall be determined by inclusion of the following:
1. All electrical equipment, conductors, conduit, etc.,
2. All material,
3. All labor,
4. Overhead and profit.
A-903.2.1 Calculation of construction costs for solar electric (also known as photovoltaic) systems. 273
A-903.2.1.1 Solar electric system or photovoltaic system defined: For the purposes of this subsection, the terms "solar electric system" and "photovoltaic system" shall each mean the total components and subsystems that, in combination, convert solar energy into electrical energy suitable for connection to a utilization load.
1. Non-refundable application fee:. . . . . $60
2. Initial license and annual renewals:. . . . . $100
A-903.5 Electrical contractor license: 274 The fees for obtaining and renewing a license as an electrical contractor shall be as follows:
1. Non-refundable application fee:. . . . . $60
2. Initial license and annual renewals:. . . . . $160
The application fees are in addition to any fees charged by an agency which the department authorizes to administer the examination.
Notes
271 | |
272 | Amended, Bill No. 110533 (approved November 14, 2011). |
273 | Added, Bill No. 110533 (approved November 14, 2011). |
274 | Amended, Bill No. 080853 (approved December 8, 2008). |