(A) To the extent practicable, proposed ditches and waterways which are to convey off-site flows through the site shall be stabilized upon construction.
(B) Where new waterways are constructed, they shall be stabilized to the extent practicable prior to their use to convey flood flows.
(Ord. 18-08, passed 1-14-19)
(A) Stockpiles of soil and other erodible or floatable building materials (sand, limestone and the like) shall not be located in floodplains, overflow routes or areas subject to frequent inundation.
(B) If a stockpile is to remain in place for more than three days, then sediment and erosion control shall be provided for the stockpile.
(Ord. 18-08, passed 1-14-19)