Section
General Provisions
158.001 Introduction/Title
158.002 Wetlands
158.003 Authority
Erosion Control
158.015 Erosion control provisions
158.016 Definitions
158.017 General principles
158.018 Site development permit
Stormwater Management
158.030 Stormwater management provisions
158.031 Introduction
158.032 General project requirements
Design Criteria for Storm Water Management
158.045 Purpose
158.046 Definitions
158.047 Applicability
158.048 Drainage plan submittal requirements
158.049 Basic drainage plan
158.050 Advanced drainage plan
158.051 Water quality and multiple uses
158.052 Design criteria, standards, methods and BMP
158.053 Accommodating flows from upstream tributary areas
158.054 Early completion of detention facilities
158.055 Fee in lieu of detention
158.056 Maintenance responsibility
158.057 Conflicts
Design Criteria for Storm Sewers and Surface Swales
158.070 Storm sewer
158.071 Culverts
158.072 Swales/ditches
Appendix A: Table 1 Huff Quartile Distributions
Appendix B: Table 2 Rainfall Data for Critical Duration Analysis and other Hydrologic Calculations
Appendix C: Detention Volume vs. Percent Impervious
Appendix D: Storm Manhole Detail