A. General Requirements. New development or modifications to existing development shall be designed to control discharges and pollutants in runoff pursuant to the requirements of the NPDES permit. The city engineer shall approve the WQMP and BMPs that may be implemented to achieve compliance with the NPDES permit and shall approve the manner of implementation.
B. Construction Discharge and Runoff Compliance. All individual grading and building project permits shall conform to the State General Construction NPDES permit requirements and implement measures, including adherence to their stormwater pollution prevention plan, to ensure that all pollutants from the site will be either eliminated or reduced to the maximum extent practicable, and will not cause or contribute to an exceedance of water quality objectives as described in the San Diego Regional Water Quality Control Board Basin Plan. All grading and building activities will be in compliance with the Grading, Erosion and Sediment Control Ordinance at Chapter 15.52 of this code; the Grading Manual; other applicable ordinances; federal, state, and local permits; and other applicable requirements.
(Ord. 472 § 1, 2012)