Before issuance or renewal of a license under this Chapter the applicant must file an updated site plan, which must be corrected annually at time of certification, showing:
(a) License boundary and property boundaries, and setback area.
(b) Portion of tract actually being excavated, and proposed excavation areas.
(c) The location of each building, equipment, processing plant, stockpile, berm, overburden, and other improvement or quarry activity in the license boundary.
(d) Permanent roads and temporary haul roads.
(e) Water supply and wastewater disposal.
(f) The date of approval of a current sediment control and stormwater management plan.
(g) The date of approval of a current sediment control permit.
(h) Compliance with state air quality operating permit requirements, specifying equipment locations.
(i) Compliance with state water quality discharge permit requirements, specifying discharge locations.
(j) Location and description of each item of control equipment.
(k) Abandoned areas, slope grades of abandoned areas, and a projected schedule of future abandoned areas.
(l) Certification of compliance with this Chapter. (Mont. Co. Code 1965, § 98-11; 1972 L.M.C., ch. 16, § 5; 1992 L.M.C., ch. 1, § 1.)