§ 51.046 LOCATION OF CONNECTION.
   The connection of the building sewer into the public sewer shall be made at the "Y" branch designated for that property, if such branch is available at a suitable location. If the public sewer is 12 inches in diameter or less and no properly located "Y" branch is available, the owner shall at his expense install a "Y" branch in the public sewer or make the connection with a saddle of approved type at a location approved by the Superintendent. Where the public sewer is greater than 12 inches and no properly located "Y" branch is available, a neat hole may be cut into the public sewer to receive the building sewer with entry in the downstream direction of an angle of about 45 degrees. A 45 degree ell may be used to make said connection provided the spigot end is cut so as not to extend past the inner surface of the public sewer. The invert of the building sewer at the point of connection shall be at the same or at a higher elevation than the invert of the public sewer, but no higher than a point one-half the vertical distance between the invert and crown of the public sewer. A smooth, neat joint shall be made and the connection made secure and watertight by encasement in concrete. Manholes shall be constructed at any junction of an eight-inch diameter or larger sewer into public sewer.
(Ord. 1984-35, passed 12-18-84) Penalty, see § 51.999
§ 51.047 CONNECTION OF SEWER BY REASON OF ACTUAL DISTANCE FROM BUILDING TO CONNECTING POINT.
   A person shall not avoid connection to such sewer by reason of actual distance from the building or structure to the connecting point at such sewer.
(Ord. 1984-35, passed 12-18-84) Penalty, see § 51.999
§ 51.048 INSPECTIONS; SUPERVISION OF CONNECTIONS TO PUBLIC SEWER.
   The applicant for the building sewer shall notify the Superintendent at least one working day in advance of when the building sewer will be ready for inspection and connection to the public sewer. The connection shall be made under the supervision of the said Superintendent or his representative.
(Ord. 1984-35, passed 12-18-84)
§ 51.049 MAINTENANCE OF CONNECTION BY OWNER.
   The building sewer from the building drain to the connection with the public sewer shall be maintained by the owner at no expense to the city.
(Ord. 1984-35, passed 12-18-84)
§ 51.050 ONE-WAY FLOW CHECK VALVE INSTALLATION REQUIRED.
   (A)   All new customers of city sewage services shall install a one-way flow check valve on their connection to the city's sewage system.
   (B)   All new customers of city sewage services shall bear full responsibility for installation of a one-way flow check valve on their connection and bear the full amount of any and all costs resulting from the installation.
(Ord. 1994-1, passed 2-22-94)
USE OF PUBLIC SEWERS
§ 51.065 DISCHARGE OF STORMWATER AND OTHER UNPOLLUTED DRAINAGE.
   (A)   No person shall discharge or cause to be discharged any storm water, ground water, roof runoff, subsurface drainage, cooling water or unpolluted industrial process waters to any sanitary sewer.
   (B)   Storm water and any other unpolluted drainage shall be discharged to such sewers as are specifically designated as combined sewers or storm sewers, or to a natural outlet approved by the City Engineer. Industrial cooling water or unpolluted process waters may be discharged upon approval of the City Engineer into a storm sewer or natural outlet.
(Ord. 1984-35, passed 12-18-84) Penalty, see § 51.999