§ 1304.02 ZONING PERMIT APPLICATIONS.
   (A)   New construction.
      (1)   New construction or additions to single-family and two-family dwellings — $200.
      (2)   New construction or additions to multi-family dwellings — $200 single unit base fee, plus $20 for each additional dwelling unit.
      (3)   New construction - accessory structures up to 200 square feet of gross floor area — $50.
      (4)   New construction - accessory structures over 200 square feet of gross floor area — $75.
   (B)   Commercial, industrial, conditional and other nonresidential uses. (New construction or addition to existing building).
      (1)   Major Site Plan - $500 first 5,000 square feet of building gross floor area, $10 for each 1,000 square feet or fraction thereof over 5,000.
      (2)   Minor Site Plan - $250 first 5,000 square feet of building gross floor area, $10 for each 1,000 square feet or fraction thereof over 5,000.
   (C)   Change in use when the zoning classification and building dimensions are not changed — $25.
   (D)   Signs, and other accessory structures (excluding fences and parking, as regulated by divisions (E) and (F) of this section) — $Permanent - $50; temporary - $30.
   (E)   Fences — $30.
   (F)   Off-Street parking and loading and/or unloading areas (when developed separately and not included in divisions (B)(1) and (2) above).
      $150 first 5,000 sq ft of parking lot area; $10 for each 1,000 sq ft or fraction thereof over 5,000.
   (G)   Certificate of appropriateness applications:
      (1)   Residential - $40, plus applicable zoning and building fees.
      (2)   Nonresidential - $75, plus applicable zoning and building fees.
      (3)   Demolition - $200, plus applicable zoning and building fees.
   (H)   Minor Administrative Modification - $100, plus applicable zoning and building fees.
   (I)   Zoning Certificate of Occupancy Requirements. (no fee) Prior to the issuance of the building final certificate of occupancy permit (§ 1304.03), the city shall require a zoning certificate of occupancy be issued by the Planning Department in accordance with § 1132.14 of the city’s zoning code. The purpose of this permit is to ensure that all zoning and engineering requirements have been met prior to final occupancy of the site.
   (J)   Temporary Use Permit (§ 1133.16) - $25.
(Ord. 5472, passed 4-12-83; Am. Ord. 6495, passed 5-22-90; Am. Ord. 6853, passed 6-22-93; Am. Ord. 7451, passed 11-11-97; Am. Ord. 9049, passed 11-23-04; Am. Ord. 9542, passed 6-12-07; Am. Ord. 2009-071, passed 9-8-09; Am. Ord. 2021-004, passed 1-26-21)