§ 26-122.   Cost of Installing Water Lateral.
Should the improved property owner not install the necessary water lateral within 120 days after notification to the property owner, the Township may make the installation and immediately bill the property owner for the cost of such installation or institute court proceedings to require property owner to make such installation or take other action which the Township finds appropriate. Connection to a water main by an improved property owner shall only be made after such installation is approved by the Township Engineer and all permits have been obtained.
(Ord. 88, § 1, 6/11/80)