1. As Provided by Township. In those cases where, in the opinion of the Township Engineer, it is impracticable to install a meter at the time a connection is made to the Water system, a flat rate shall be charged until such time as a meter is installed. In such cases the temporary flat rate to apply during this period shall be the quarterly rate of $15 per Consumer Unit.
2. Building Construction Purposes. The flat rate charge for building construc tion purposes shall be $15 per quarter, per unit of construction; the first quarterly payment shall be payable upon application to the Township for Water service. Such charge per quarter shall cover service until the particular unit of construc tion is completed.
3. Temporary Flat Rates. In those cases where, in the opinion of the Township Manager, it is impracticable to install a meter at the time that a connection is made to the Water System, a flat rate shall be charged until such time as a meter is installed. In such cases the temporary flat rate to apply during this period shall be the quarterly rate of $15 per Consumer Unit.
(Ord. 68, § 2, 1/10/79)