§ 573.05 Retaining Works; Specifications
   All retaining works and structures, including wharves, docks, piers, bulkheads, or revetments constructed or repaired along the harbor shall be built at such locations as are determined by the Director of Port Control, or the Director’s designee, and shall comply with design, material, engineering and construction requirements specified in rules promulgated by the Director under Section 573.09. Council may by resolution prescribe requirements for construction or repairs additional to those specified by the Director of Port Control in order that the requirements of any particular or peculiar condition may be met. No retaining wall or structure, including wharves, docks, piers, bulkheads or revetments shall be constructed, repaired or renewed along the harbor (except that portion of harbor under the jurisdiction of the United States Government) without first securing written permission from the Director, or the Director’s designee, which permission shall only be given after submitting to the Director, or the Director’s designee, detailed plans of the proposed construction.
(Ord. No. 1606-11. Passed 3-19-12, eff. 3-22-12)