Skip to code content (skip section selection)
Compare to:
Chicago Overview
Municipal Code of Chicago
MUNICIPAL CODE OF CHICAGO
TITLE 1 GENERAL PROVISIONS
TITLE 2 CITY GOVERNMENT AND ADMINISTRATION
TITLE 3 REVENUE AND FINANCE
TITLE 4 BUSINESSES, OCCUPATIONS AND CONSUMER PROTECTION
TITLE 5 HOUSING AND ECONOMIC DEVELOPMENT
TITLE 6 HUMAN RIGHTS*
TITLE 7 HEALTH AND SAFETY
TITLE 8 OFFENSES AFFECTING PUBLIC PEACE, MORALS AND WELFARE
TITLE 9 VEHICLES, TRAFFIC AND RAIL TRANSPORTATION
TITLE 10 STREETS, PUBLIC WAYS, PARKS, AIRPORTS AND HARBORS
TITLE 11 UTILITIES AND ENVIRONMENTAL PROTECTION
TITLE 12 RESERVED
TITLE 13 BUILDINGS AND CONSTRUCTION
TITLE 14 RESERVED*
TITLE 14A ADMINISTRATIVE PROVISIONS OF THE CHICAGO CONSTRUCTION CODES*
TITLE 14B BUILDING CODE*
TITLE 14C CONVEYANCE DEVICE CODE*
TITLE 14E ELECTRICAL CODE*
TITLE 14F FIRE PREVENTION CODE*
TITLE 14G FUEL GAS CODE*
TITLE 14M MECHANICAL CODE*
TITLE 14N 2022 ENERGY TRANSFORMATION CODE*
TITLE 14P PLUMBING CODE*
TITLE 14R BUILDING REHABILITATION CODE*
TITLE 14X MINIMUM REQUIREMENTS FOR EXISTING BUILDINGS*
TITLE 15 FIRE PREVENTION
TITLE 16 LAND USE
TITLE 17 CHICAGO ZONING ORDINANCE
TITLE 18 BUILDING INFRASTRUCTURE
APPENDIX TO THE MUNICIPAL CODE OF CHICAGO (RESERVED)*
TABLES
Chicago Zoning Ordinance and Land Use Ordinance
Loading...
14A-10-1004.4 Investigation.
The building official will conduct a preliminary review of each application and recommend to the Committee whether the construction material, construction method, system of construction, or arrangement of materials should be permitted under the conditions outlined in the application or under further conditions identified by the building official.
14A-10-1004.4.1 Additional information.
If, in the judgment of the building official, further evidence is necessary regarding the suitability or safety of such construction material, construction method, system of construction, or arrangement of materials, the building official may require further tests to be made or additional data to be submitted by the applicant.
14A-10-1004.5 Hearing.
The Committee must consider each recommendation of the building official at a public hearing, at which an Illinois- licensed architect, structural engineer, or professional engineer must present the request on behalf of the applicant. If, following the applicant’s presentation, the Committee determines that further evidence is necessary regarding the suitability or safety of the request, the Committee may require an additional hearing or condition its approval on submission of suitable evidence to the building official. At the conclusion of the hearing, the Committee must vote on whether to accept, with or without additional conditions, the preliminary recommendation of the building official.
14A-10-1004.6 Records.
The building official must maintain a public record of the Committee’s actions.
14A-10-1004.7 Effect.
Decisions by the Committee pursuant to Section 14A-10-1004 are project-specific. A decision does not have any precedential effect, nor does it require the Committee to approve or deny a similar request in the future. The building official, however, may consider actions of the Committee in evaluating requests for alternative code approval under Section 14A-10-1003.
14A-10-1005 BUILDING BOARD OF APPEALS.
14A-10-1005.1 Purpose.
In order to ensure that the spirit of the Chicago Construction Codes pertaining to the issuance of permits is observed, public safety secured, and substantial justice done, the Building Board of Appeals is created to hear appeals from decisions and determinations of the building official relating to the issuance of a permit or work done under a permit.
Loading...