An agreement and waiver for improvements and modifications to adjoining public roads, including the installation of traffic signals, as identified within the traffic study shall be executed by the developer prior to approval and recordation of the first final plat. Dedication of permanent right-of-way to accommodate the placement of future signal poles and controller boxes shall be provided as necessary. In addition, adequate easements to accommodate detector loops and interconnect cabling shall be provided as necessary. Temporary right-of-way required during the construction/installation shall be provided as necessary. (Ord. 1711, 10-23-2006)