Skip to code content (skip section selection)
Compare to:
West Des Moines Overview
West Des Moines, IA Code of Ordinances
West Des Moines, IA Planned Unit Development
WEST DES MOINES, IA PLANNED UNIT DEVELOPMENT ORDINANCES
PREFACE
PUD #1 THE PRESERVE ON GRAND
PUD #2 GRAND WOODS
PUD #3 HEATHERWOOD
PUD #4 HEATHERWOOD 2
PUD #5 BEH
PUD #6 BEH II
PUD #7 PARKHAVEN
PUD #8 SOMERFIELD
PUD #9 SOUTHWOODS KNOLL
PUD #10 S AND F/KARP
PUD #11 SOUTHWOODS EAST 2
PUD #12 SOUTHWOODS EAST
PUD #13 STONEBRIDGE
PUD #14 WISTFUL VISTA
PUD #15 SOUTHWOODS WEST
PUD #16 WESTBROOKE
PUD #17 THE KNOLLS
PUD #18 WEST PARK
PUD #19 WOODLAND PARK
PUD #20 THE SHOPPES AT VALLEY WEST
PUD #21 WESTDALE PLAZA
PUD #22 COUNTRY PARK
PUD #23 JORDAN PARK VISTA
PUD #24 MEADOWVIEW
PUD #25 SUN PRAIRIE
PUD #26 SUN PRAIRIE WEST
PUD #27 WEST LAKES
PUD #28 COUNTRY CLUB OFFICE PLAZA (CCOP)
PUD #29 REED'S CROSSING
PUD #30 GLEN OAKS
PUD #31 ASHWORTH CORRIDOR
PUD #32 RYUN FARM
PUD #33 WIRTZ PROPERTY
PUD #34 BOONE FARM
PUD #35 98TH STREET
PUD #36 WESTOWN CENTRE
PUD #37 CORPORATE PLACE
PUD #38 WRENWOOD PLACE
PUD #39 WATER TOWER PLACE
PUD #40 THREE FOUNTAINS COMMERCIAL
PUD #41 BLUE CREEK
PUD #42 WESTIN HEIGHTS
PUD #43 SOUTH WATER TOWER PLACE
PUD #44 42ND STREET
PUD #45 50TH STREET
PUD #46 MAPLE GROVE NORTH
PUD #47 JORDAN CREEK TOWN CENTER
PUD #48 BRIDGEWOOD
PUD #49 ASHAWA
PUD #50 VALLEY GREEN
PUD #51 5940 UNIVERSITY
PUD #52 COLBY OFFICE PARK
PUD #53 GREENWAY CROSSING
PUD #54 WEST GRAND BUSINESS PARK
PUD #55 MILLS CROSSING
PUD #56 RESERVED
PUD #57 ASHWORTH CROSSING
PUD #58 BATY FARM
PUD #59 DEPOT AT ASHWORTH
PUD #60 LAKE VIEW
PUD #61 BENNETT
PUD #62 WEST GLEN TOWN CENTER
PUD #63 LINCOLN STREET PARK
PUD #64 KING'S VALLEY
PUD #65 CLEVEN
PUD #66 KING'S RIDGE
PUD #67 RESERVED
PUD #68 GALLERIA
PUD #69 ROBEL FARM
PUD #70 WELLS FARGO WEST DES MOINES CAMPUS
PUD #71 JORDAN CREEK CROSSING I
PUD #72 SOUTH MAPLE GROVE
PUD #73 BELLA SOUTH
PUD #74 JORDAN CREEK CROSSING II
PUD #75 JORDAN HEIGHTS
PUD #76 MAPLE GROVE WEST
PUD #77 PUBLIC SAFETY STATION #19
PUD #78 HERITAGE BEND
PUD #79 VILLAGE AT JORDAN CREEK
PUD #80 TALLYN'S REACH
PUD #81 VILLAGE OF PONDEROSA
PUD #82 PLAZA AT JORDAN CREEK
PUD #83 JORDAN CREEK BUSINESS PARK
PUD #84 MERCY WEST LAKES
PUD #85 LUTHERAN-MYERS
PUD #86 COUNTRY CLUB DENTAL
PUD #87 JORDAN WEST
PUD #88 PARADISE POINTE
PUD #89 SILVERWOOD
PUD #90 BROADMOOR APARTMENTS AT JORDAN CREEK
PUD #91 AVIVA USA
PUD #92 ESCALADE TOWNHOMES
PUD #93 WESTOWN CITY CENTER
PUD #94 TACO JOHN'S
PUD #95 RACCOON RIVER QUARRIES
PUD #96 WEST BANK-CASEY'S
PUD #97 60TH AND ASHWORTH CENTER
PUD #98 FAREWAY
PUD #99 DENTON
PUD #100 KINGS LANDING
PUD #101 ROGER'S FARM
PUD #102 MIDWEST TECHNOLOGY BUSINESS PARK
PUD #103 CLOCKTOWER SQUARE
PUD #104 GRAND VALLEY
PUD #105 ELDORADO ESTATES
PUD #106 1ST STREET REDEVELOPMENT
PUD #107 PLATINUM POINTE TOWNHOMES
PUD #108 MAJESTIC OAKS
PUD #109 DELLA VITA
PUD #110 SAMMONS FINANCIAL GROUP
PUD #111 QUAIL PARK WOODS
PUD #112 PHENIX
PUD #113 THE FOUNDRY
PUD #114 THE PARKWAYS
PUD #115 TRAIL SIDE
PUD #116 RB WDM GRAND LLC
PUD #117 BROWNS WOODS HOLLOW
PUD #118 WDM PUBLIC SERVICES
PUD #119 CEDAR RIDGE
PUD #120 GRAND RIDGE
PUD #121 THE PRESERVE
PUD #122 MIDTOWN REDEVELOPMENT
PUD #123 DOWLING CATHOLIC HIGH SCHOOL
PUD #124 WENDY’S
PUD #125 SOUTH BRANCH BUSINESS PARK
PUD #126 VILLAGE ON JORDAN CREEK
PUD #127 KING’S GROVE
PUD #128 WESTOWNE SHOPPING CENTER
PUD #129 MILLS LANDING
PUD #130 LINNWILL HY-VEE
PUD #131 THE WILDER PINES
PUD #132 M&W MINI STORAGE (CUBESMART)
PUD #133 ERIK'S BIKES
PUD #134 THE VILLAGE AT SUGAR CREEK
PUD #135 PAVILION PARK
PUD #136 JORDAN RIDGE
PUD #137 JORDAN CREEK TOWER
PUD #138 SUITE SHOTS
PUD #139 ASHWORTH 88
PUD #140 WOODHOUSE
072-13: PHASING; RELATED PUBLIC STREET IMPROVEMENTS AND RIGHT OF WAY DEDICATION:
The phasing plan of development for the area within the South Maple Grove PUD is included as part of this document, identified as exhibit B on file in the city, for purposes of concept description and delineation. The numbering of the phases is not meant to reflect the actual order of development. However, any deviations to change the phasing boundaries will require the review and approval by the plan and zoning commission and city council. (Ord. 1610, 10-25-2004)
Phase 1:   A.   Public Streets: In accordance with the South Maple Grove traffic report, at such time of platting or development within phase 1, the applicant proposing said platting and/or development shall be responsible for:
Construction of 92nd Street, from the phase 1/phase 2 line to the railroad tracks. A thirty one foot (31') wide street shall be constructed (2 lanes), with forty three foot (43') width (3 lanes) constructed at all of the intersections with 92nd Street, to provide for a left turn lane and future median placement.
Construction of 98th Street, from the phase 1/phase 2 line to the minor collector street. A twenty six foot (26') wide street shall be constructed (2 lanes).
Construction of Westown Parkway, from the phase 1/phase 2 line to 88th Street. A thirty one foot (31') wide street shall be constructed (2 lanes), with forty three foot (43') width (3 lanes) constructed at all of the intersections with Westown Parkway, to provide for a left turn lane and future median placement.
Construction of the minor collector street located just north of the park/school site, from 92nd Street to 88th Street. A thirty one foot (31') wide street (2 lanes) shall be constructed, with thirty seven foot (37') width (3 lanes) constructed at the intersection with 92nd Street to provide for a left turn lane.
Construction of all other streets (local streets) at a width of twenty six feet (26') (2 lanes), except at intersections with 92nd Street and Westown Parkway construct a thirty seven foot (37') width (3 lanes) to provide for a left turn lane.
At such time that development occurs just north or south of the minor collector street located just north of the park/school site, construction of said minor collector street located just north of the park/school site, from 92nd Street to 98th Street. A thirty nine foot (39') wide street shall be constructed (3 lanes), to provide for a continuous left turn lane from 92nd Street to 98th Street.
Construction of the remaining unpaved section of 88th Street (approximately 100 feet - immediately south of railroad tracks). A thirty one foot (31') wide street shall be constructed to match existing pavement.
B.   Right Of Way Dedication: In accordance with the South Maple Grove traffic report, at such time of platting or development within phase 1, the applicant proposing said platting and/or development shall deed to the city:
One hundred twenty feet (120') of right of way for 92nd Street, from the phase 1/phase 2 line to the railroad tracks.
Additional 98th Street right of way necessary to provide fifty feet (50') of right of way from the centerline of street.
One hundred feet (100') of right of way for the minor collector street located just north of the park/school site, from 92nd Street to 98th Street.
One hundred twenty feet (120') of right of way for Westown Parkway, from the phase 1/phase 2 line to 88th Street, with fifty foot (50') intersecting radii provided at intersection with 88th Street.
Seventy feet (70') of right of way for the minor collector street located just north of the park/school site, from 92nd Street to 88th Street.
Additional 88th Street right of way necessary to provide fifty feet (50') of right of way from the centerline of street (88th Street is a major collector), with fifty foot (50') intersecting radii provided at intersection with Westown Parkway right of way.
Sixty feet (60') of right of way for all other streets (local streets), with seventy feet (70') provided at intersections with 92nd Street and Westown Parkway to accommodate left turn lanes. (Ord. 1633, 5-23-2005)
Phase 2:   A.   Public Streets: In accordance with the South Maple Grove traffic report, at such time of platting or development within phase 2, the applicant proposing said platting and/or development shall be responsible for:
Construction of 92nd Street, from the phase 1/phase 2 line to the phase 2/phase 4 line. A thirty one foot (31') wide street shall be constructed (2 lanes), with forty three foot (43') width (3 lanes) constructed at all of the intersections with 92nd Street, to provide for a left turn lane and future median placement.
Construction of Westown Parkway, from the phase 1/phase 2 line to 98th Street. A thirty one foot (31') wide street shall be constructed (2 lanes), with forty three foot (43') width (3 lanes) constructed at all of the intersections with Westown Parkway, to provide for a left turn lane and future median placement.
Construction of 98th Street, from the phase 1/phase 2 line to Westown Parkway. A twenty six foot (26') wide street shall be constructed (2 lanes).
Construction of all other streets (local streets) at a width of twenty six feet (26') (2 lanes), except at intersections with 92nd Street and Westown Parkway construct a thirty seven (37') foot width (3 lanes) to provide for a left turn lane.
B.   Right Of Way Dedication: In accordance with the South Maple Grove traffic report, at such time of platting or development within phase 2, the applicant proposing said platting and/or development shall deed to the city:
One hundred twenty feet (120') of right of way for 92nd Street, from the phase 1/phase 2 line to the phase 2/phase 4 line, with fifty foot (50') intersecting radii provided at intersection with Westown Parkway right of way.
Additional 98th Street right of way necessary to provide fifty feet (50') of right of way from the centerline of street, with fifty foot (50') intersecting radii provided at intersection with Westown Parkway right of way.
One hundred twenty feet (120') of right of way for Westown Parkway, from the phase 1/phase 2 line to 98th Street, with fifty foot (50') intersecting radii provided at intersections with 92nd Street and 98th Street right of way.
Sixty feet (60') of right of way for all other streets (local streets), with seventy feet (70') provided at intersections with 92nd Street and Westown Parkway to accommodate left turn lanes.
Phase 3:   A.   Public Streets: In accordance with the South Maple Grove traffic report, at such time of platting or development within phase 3, the applicant proposing said platting and/or development shall be responsible for:
Construction of the minor collector street located between Ashworth Road and Westown Parkway (realigned 88th Street), from the west boundary of the PUD parcel to Westown Parkway. A thirty one foot (31') wide street shall be constructed (2 lanes), with thirty seven foot (37') width (3 lanes) constructed at the intersection with Westown Parkway to provide for a left turn lane.
Construction of all other streets (Local streets) at a width of twenty six feet (26') (2 lanes), except at intersections with Westown Parkway construct a thirty seven foot (37') width (3 lanes) to provide for a left turn lane.
B.   Right Of Way Dedication: In accordance with the South Maple Grove traffic report, at such time of platting or development within phase 3, the applicant proposing said platting and/or development shall deed to the city:
Seventy feet (70') of right of way for the minor collector street located between Ashworth Road and Westown Parkway (realigned 88th Street), from the westerly boundary of the PUD parcel to Westown Parkway, with fifty foot (50') intersecting radii provided at intersection with Westown Parkway right of way.
Sixty feet (60') of right of way for all other streets (local streets), with seventy feet (70') provided at intersections with Westown Parkway to accommodate left turn lanes.
Phase 4:   A.   Public Streets: In accordance with the South Maple Grove traffic report, at such time of platting or development within phase 4, the applicant proposing said platting and/or development shall be responsible for:
Construction of 92nd Street, from the phase 2/phase 4 line to the westerly boundary of the PUD. A thirty one foot (31') wide street shall be constructed (2 lanes), with forty three foot (43') width (3 lanes) constructed at all of the intersections with 92nd Street, to provide for a left turn lane and future median placement.
Construction of all other streets (local streets) at a width of twenty six feet (26') (2 lanes), except at intersections with 92nd Street and Westown Parkway construct a thirty seven foot (37') width (3 lanes) to provide for a left turn lane.
B.   Right Of Way Dedication: In accordance with the South Maple Grove traffic report, at such time of platting or development within phase 4, the applicant proposing said platting and/or development shall deed to the city:
One hundred twenty feet (120') of right of way for 92nd Street, from the phase 2/phase 4 line to the westerly boundary of the PUD, with fifty foot (50') intersecting radii provided at intersection with Westown Parkway right of way.
Sixty feet (60') of right of way for all other streets (local streets), with seventy feet (70') provided at intersection with Westown Parkway right of way to accommodate left turn lanes. (Ord. 1610, 10-25-2004)