The developer of the Galleria Development has entered into an agreement with MidAmerican Energy for the installation of all streetlights abutting the Galleria specific plan area with the exception of those streetlights along public streets adjacent to parcels F and G. The developer will be required at the time of platting of parcels F and G to provide the necessary agreement with MidAmerican Energy, and payment for lights, if required, for the installation of streetlights adjacent to these parcels. Installation of the streetlights shall occur in conjunction with development of each respective parcel or sooner if so desired by the applicant. Any additional lights adjacent to any road within the Galleria Development deemed necessary to achieve the street lighting standards set by the city shall be the responsibility of the developer. (Ord. 1920, 5-31-2011)