Pedestrian access shall be provided from Parcels B and C to Parcel A to permit and encourage pedestrian movement between parcels versus utilizing motorized vehicles for access.
A ten foot (10') wide concrete bike/pedestrian trail is proposed along the south side of Mills Civic Parkway. At the time of development, the developer will need to coordinate with the Parks and Recreation Department for the installation of the trail. The developer shall be responsible for the equivalent of four feet (4') of the paving costs. (Ord. 1358, 4-19-1999)