A Master Storm Water Management Plan (SWMP) shall be required in conjunction with the Preliminary Plat or first Site Plan if not subdividing the property. Individual Storm Water Management Plans consistent with the Master SWMP will be required with the site plan for each lot or PUD Parcel.
The Developer will have said Storm Water Management Plans prepared by a Professional Engineer licensed in the State of Iowa. The storm water management plan shall comply with the City's applicable design standards for storm water management existing at the time each plat or site plan is approved. The method of storm water management and the storm water conveyance system shall be determined prior to City approval of a preliminary plat or site plan. (Ord. 2615, 7-17-2024)