Buffering between zoning districts and differing uses internal within PUD parcels A, B and C shall not be required as set forth in Title 9, Chapter 19 of the city code. However, buffer widths and planting requirements as required per Title 9, Chapter 19 shall be provided along the perimeter of a PUD parcel, including PUD parcels A, B and C when a use adjacent to the PUD perimeter is different than the land use along the perimeter within an adjacent PUD parcel. The burden of provision of the buffer shall lie with the parcel that contains the more intense use.
Additionally, a minimum thirty-foot (30') wide buffer with landscape vegetation shall be provided along all major and minor arterials and major collector roadways within the Pavilion Park PUD development. Landscape vegetation shall be provided at a rate consistent with the vegetation requirements outlined in Title 9, Chapter 19 of the city code for a thirty-foot (30') buffer. Landscape vegetation shall be installed along the length of the roadway at the time of development of the first site within a PUD parcel adjacent to the roadway and prior to issuance of the first final occupancy permit for any structure within the respective parcel. (Ord. 2407, 3-16-2020)