In addition to the general conditions as stated herein the PUD, the following criteria shall apply to the area designated on the PUD sketch plan on file in the City Clerk's Office. The PUD sketch plan document, which is made a part of this rezoning action, delineates Parcel A, B, and C:
A. Parcel A: The following land use, development standards, and use regulations shall apply to said development of Parcel A:
All permitted (P) and permitted conditional (Pc) uses set forth in title 9, "Zoning" of the City Code for the Light Industrial (LI) Zoning District, shall be allowed with the approval of the appropriate review body, except as follows:
The following permitted conditional (Pc) uses shall be considered permitted (P) uses:
• Heavy construction contractors offices with warehouse component and paved outdoor storage yards (SIC 16)
• Local and suburban transit, (SIC 4111)
• Terminal & service facility for motor vehicle passenger transportation (SIC 4173)
• Radiotelephone communications (SIC 4812) - including building mounted antennas or dishes and transmitting/receiving towers
• Fire protection (SIC 9224)
• Unattended fuel pumps
• Product transportation services, garbage collection and transport - not disposal (SIC 4212)
No building shall be located closer than twenty five feet (25') from the back of curb of a private street.
B. Parcel B: Parcel B is part of the Sugar Creek Basin and will function as a greenway and contain recreational improvements including a trail. No development will occur on the parcel other than the proposed recreational or drainage related improvements. Parcel B cannot be utilized for open space required of other parcels within the PUD. Required landscaping installed for screening purposes for Parcel A may encroach on Parcel B.
With the approval of the appropriate review body, the only uses that shall be allowed within Parcel B as set forth in title 9, "Zoning" of the City Code for Open Space (OS) Zoning District are: parks, public spaces, trails, and pedestrian/biking facilities.
C. Parcel C: Parcel C is functioning as a drainage way, thus no development will occur on the parcel other than drainage related improvements or the proposed access to South 88th Street. Required setbacks for Parcel A can be measured from the east property line of Parcel C, however no improvements can be located on Parcel C. Parcel C can be utilized for open space requirements for other parcels within the PUD. Required open space landscape or landscaping installed for screening purposes may encroach on Parcel C as long as drainage is not obstructed. (Ord. 2300, 5-14-2018)