A traffic impact study (traffic report) dated December 31, 2014, has been prepared by the city of West Des Moines for the Platinum Pointe townhome development. The traffic report caps the traffic generated from all ground within this PUD at three thousand five hundred thirty eight (3,538) average daily trips, two hundred sixty nine (269) A.M. peak hour trips and three hundred twenty eight (328) P.M. peak hour trips. The traffic report also outlines the ultimate paving requirements for the major roadways in the vicinity of the Platinum Pointe townhome development. Development of the site will need to abide by the recommendations of the December 2014 traffic report. In the event the number of dwelling units is increased or the layout of the proposed development, including access connections to surrounding public streets is altered, if determined necessary, a new traffic study to analyze the changes may be required. Development of the site will need to abide by the recommendations of the new traffic study. (Ord. 2090, 5-4-2015)