Specific stormwater management plans will be required with the development of each parcel. The developer will have said specific stormwater management plans prepared by a professional engineer licensed in the state of Iowa, in conjunction with the submittal of a specific development proposal for any portion of property included within the PUD. All specific stormwater management plans shall comply with the city's current design standards for stormwater management. The method of stormwater management and the stormwater conveyance system shall be determined prior to city approval of any development proposal.
At time of platting or site development (whichever is more applicable to knowledge of stormwater detention measures), ownership and responsibility for all stormwater detention areas and private stormwater detention outlet structures will need to be established through the execution of a stormwater facility maintenance agreement. (Ord. 2052, 9-8-2014)