At the time of subdivision platting within the Kings Landing PUD, the subdivider shall be responsible for construction and/or installation of all required public infrastructure improvements in accordance with the city's subdivision ordinance, and as indicated on the approved PUD sketch plan. With any subdivision plat within the PUD, the subdivider shall be responsible for constructing and/or installing the public infrastructure necessary to support development within the subdivision in a manner that will assure that the public infrastructure functions at an acceptable level of service (per the city's comprehensive plan) and that it complies with all city ordinances.
A. Paving Requirements:
1. Stagecoach Drive: Is classified as a major collector roadway which requires one hundred twenty feet (120') of total right of way or sixty feet (60') from the center of the roadway. A minimum of two (2) through lanes plus auxiliary lanes will need to be paved. The ultimate cross section should be graded. The developer will need to work with adjacent property owners to determine a satisfactory alignment. (Ord. 2042, 6-16-2014)