Skip to code content (skip section selection)
Compare to:
CHAPTER 153: SUBDIVISION CODE
Section
General Provisions
   153.001   Title
   153.002   Purpose and intent
   153.003   Jurisdiction and conflicting laws
   153.004   Interpretation
   153.005   Incorporation of figures and standards
   153.006   Disclaimer of liability
   153.007   Rules of construction
   153.008   Selected definitions
General Design and Improvement Standards; Standards for Lots
   153.020   General prohibition
   153.021   General suitability for subdivision
   153.022   General design standards
   153.023   Standards for lots
   153.024   Street frontage required
   153.025   Reference monuments required
General Standards for Streets
   153.035   Standards for grading
   153.036   Subgrades
   153.037   Soil subgrade modification
   153.038   Granular subbase
   153.039   Compaction verification
   153.040   Typical street sections
   153.041   Materials for flexible pavement construction
   153.042   Equipment and procedures for flexible pavement
   153.043   Materials for rigid pavement construction
   153.044   Equipment and procedures for rigid pavement
   153.045   Specifications for concrete in non-pavement areas
   153.046   Curb and gutter construction
   153.047   Grass lined ditch construction
Design Standards
   153.060   Relationship of new to existing streets
   153.061   Designing blocks
   153.062   Designing intersections
   153.063   Designing curves
   153.064   Designing dead-end streets
   153.065   Designing sidewalks
   153.066   Specifications for street signs
   153.067   Dedication for public use
Utilities
   153.080   General standards for utilities
   153.081   Specific standards for water services
   153.082   Specific standards for public sanitary sewers
   153.083   Specific standards for other utilities
   153.084   Safety provisions
   153.085   Standards for easements
   153.086   Provision of green space
Administration and Enforcement
   153.120   Schedule of fees
   153.121   Authority
   153.122   Code Administrator
   153.123   City Engineer
   153.124   Planning Commission
   153.125   Complaints
   153.126   Corrective action orders
   153.127   Contents of order
   153.128   Service of order
   153.129   Stop work orders
   153.130   Emergency measures
Subdivision Process: Preliminary Plats
   153.140   Subdivision process
   153.141   Pre-application conference
   153.142   Preliminary plats
   153.143   Requirements for filing
   153.144   Action by the Planning Commission
   153.145   Action by the City Council
Improvements
   153.160   Improvement plans
   153.161   Requirements for filing
   153.162   Requirements for approval
   153.163   Construction and inspection of improvements
   153.164   Requirements for “as-built” records
   153.165   Requirements for assurance of completion
   153.166   Acceptable forms of assurance
   153.167   Term of assurance, extension
   153.168   Release of bond, escrow deposit
   153.169   Failure to complete improvements
Final Plats
   153.185   General provisions
   153.186   Requirements for filing
   153.187   Required certificates
   153.188   Administrative review procedures
   153.189   Action by the City Council
   153.190   Changes in approved final plats
   153.191   Maintenance of improvements
   153.192   Duration of guarantee
   153.193   Variations
   153.194   Review by the Planning Commission
   153.195   Action by the City Council
Amendments to Chapter
   153.210   Amendments
   153.211   Public hearing, notice
   153.212   Action by the City Council
 
   153.999   Penalty
   Appendix A: Standard Specification Plan Sheets
Cross-reference:
   Fee schedule, see also Ch. 37, App. A
   Street regulations and construction, see Ch. 92