Skip to code content (skip section selection)
Compare to:
Streetsboro Overview
Codified Ordinances of Streetsboro, OH
CODIFIED ORDINANCES OF THE CITY OF STREETSBORO OHIO
CERTIFICATION
DIRECTORY OF OFFICIALS
ADOPTING ORDINANCE NO. 1985-111
EDITOR'S NOTE
COMPARATIVE SECTION TABLE
CHARTER
PART ONE - ADMINISTRATIVE CODE
TITLE ONE - General Provisions
TITLE THREE - Legislative
TITLE FIVE - Administrative
TITLE SEVEN - Boards and Commissions
TITLE NINE - Taxation
TITLE ELEVEN - Judicial
PART THREE - TRAFFIC CODE
PART FIVE - GENERAL OFFENSES CODE
PART SEVEN - BUSINESS REGULATION CODE
PART NINE - STREETS, UTILITIES AND PUBLIC SERVICES CODE
PART ELEVEN - PLANNING AND ZONING CODE
PART THIRTEEN - BUILDING CODE
PART FIFTEEN - FIRE PREVENTION CODE
CHAPTER 149
Fees and Permit Charges
149.01    Payment of fees.
149.02    Building schedule of fees, commercial and industrial.
149.03    Commercial plans examination.
149.04    Building schedule of fees for one, two and three family dwellings.
149.05    Inspection fees and extraordinary and supplemental inspection and time charges.
149.06    Fee formula. (Repealed)
149.07    City property fees.
149.08    Sign fees.
149.09    Work started without a permit.
149.10    Subdivision schedule of fees.
149.11    Zoning schedule of fees.
149.12    Zoning certificate fees.
149.13    Various fees for ordinances, books, maps, tapes and copies.
149.14    Contractor registration fee.
149.15    Park and recreation fee for new construction developments.
149.16      Bad check fee.
149.17      Park Pavilion rental fees. (Repealed)
149.18      Preconstruction meeting fee.
149.19   Charges for professional service- nonresidential.
CROSS REFERENCES
         Zoning administration - see P. & Z. Title One
         Subdivision procedure -see P. & Z. Ch. 1175 et seq.
   149.01 PAYMENT OF FEES.
   (a)   No permit shall be issued nor shall any action be taken on any appeal until all fees, charges, expenses and bonds have been paid in full. All properly charged fees are nonrefundable unless otherwise specified in this chapter. Fees collected in error may be refunded in whole or in part.
   (b)   Where this chapter requires a permit or imposes a fee for a construction or improvement, but less than 100% of the regulated activity is undertaken, the fee charged may be proportionately reduced by the Building Director or Zoning Inspector.
(Ord. 2009-151. Passed 12-21-09.)
   149.02 BUILDING SCHEDULE OF FEES, COMMERCIAL AND INDUSTRIAL. 
(a)
Accessory Buildings. (Over 200 sq.ft.)
$175.00 includes plan exam fee
(b)
Appeal. As specified and payable to the Board of Building Standards
(c)
Asphalt.
(1)    Installation and repairs up to 3,000 sq.ft
100.00
(2)    For each 1,000 square feet or fraction
thereof in excess of 3,000 sq.ft.
10.00
(d)
Concrete.
(1)    For public and private sidewalks, aprons,
driveways and parking lots up to 3,000 SF
100.00
and for each 1,000 SF or fraction thereof inexcess of 3000 SF
10.00
(e)
Decks. 
75.00
(f)
Demolition.Buildings or structures per 5,000 sq. ft.
200.00 + .50 per 100 sq. ft.
(1)   Interior and partial demolition
200.00 + .50 per 100 sq. ft.
(g)
Electrical.
(1) Additions
130.00 + .05/sq. ft.
(2)    Adding outlets or fixtures
80.00
(3)    Adding circuits for machinery
80.00
(4)    New Buildings
250.00 + .05/ sq. ft.
(5)    Replace existing service
150.00
(6)    Remodeling
75.00 + .05/sq. ft.
(7)    Swimming pool
Above 100.00, In-ground 150.00
(8)    Temporary service
75.00
(h)
Low Voltage Wiring.
(1)   Phone, cable, data, fire alarm
120.00 (Plus $.03/sq. ft.)
Fee Payment. The following permit fees are required to be paid at the same time as the payment of the general building permit: plumbing, HVAC, electrical, concrete, fireplace, storm sewer and other permits as required by the Building Director, unless this requirement is waived by the Building Director. Plumbing, HVAC and electrical permits will not be considered issued until a signed copy of the permit application has been received by the Building Department. Any work started prior to the issuance of this permit is subject to Section 149.09 and Section 1303.11 of the Building Code.
(i)
Fence. (Over 6 feet tall)
65.00 includes post hole inspection
(j)
(EDITOR'S NOTE: Former subsection (j) was deleted by Ordinance 2022-36, passed February 28, 2022.)
(k)
Fireplace. (factory or masonry)
factory-50.00, masonry 75.00
(l)
Fire Protection.
(1)    Hood suppression
$150.00 + $3.00 per sprinkler head
(2)    Sprinklers - base fee
150.00
New Construction
150.00 plus $.10/sq. ft.
Changing heads
150.00 plus $.10/sq. ft.
(m)
HVAC.
(1)    Air conditioning.
Replace existing unit
$75.00
New unit in existing building
75.00
New building
(See new construction)
(2)    Combination units.
Replace existing units
125.00
Install new units in an existing building
125.00
(3)    Ductwork.
50.00 + .05/sq. ft.
(4)    Heating.
Replace existing unit
75.00
New unit in existing building
75.00
Space heaters such as a radiant garage heater or through-the-wall heater (new or replacement)
75.00
(5)    New Construction for Heating and Air Conditioning.
150.00 + .10/sq. ft.
(6)   Additions
100.00 + .05/sq. ft.
(n)
Plumbing.
(1)    Base fee
240.00 + .10/sq. ft.
(2)    Remodeling
75.00 + .10/sq. ft.
(3)    Repairs/alterations
75.00
(4)    Swimming pool
75.00
(5)    Water heater (New or Replacement)   
75.00
(6)   Lawn sprinkler system
75.00 (Plus $4.00 per head)
(Plus $0.04/sq. ft.)
(o)
Roofing. For replacing existing roof per building
110.00 + .03/sq. ft.
(p)
Siding. For re-siding an existing builidng
110.00 + .03/sq. ft.
(q)
Structural.  
(1) Addition
200.00 + .10/sq. ft.
(2)    New building
200.00 + .10/sq. ft.
(3)    Remodeling (including non-structural)
200.00 + .10/sq. ft.
(4)   Building Permit
200.00 + .10/sq. ft.
(r)
Swimming Pool.
In Ground 150.00, above 100.00
(s)
(EDITOR'S NOTE: Former subsection (s) was deleted by Ordinance 2022-36, passed February 28, 2022.)
Ord. 2022-36. Passed 2-28-22.)
   149.03 COMMERCIAL PLANS EXAMINATION.
   The fees and charges for the examination of commercial plans and specifications shall include an administrative charge of seventy-five dollars ($75.00) plus the City's actual cost incurred in completion of the examination through the City's retained commercial plans examiner. The administrative fee shall be paid at the time of application.
(Ord. 2022-183. Passed 12-19-22.)
   149.04 BUILDING SCHEDULE OF FEES FOR ONE, TWO AND THREE FAMILY DWELLINGS.
(a)
Accessory Buildings.
(1)    Buildings over 200 sq.ft., including detached garages and pole barns
$150.00 includes plan exam
(b)
Additions. (base fee)    
100.00 + .05/sq. ft.
(c)
Asphalt. (for driveways)
50.00
(d)
Concrete.
50.00
(e)
Decks.
75.00 includes plans exam
(f)
Demolition. (required for all buildings excluding storage sheds)
100.00
(g)
Electrical.
(1)    Accessory buildings
50.00 + .05/sq. ft.
(2) Additions
75.00 + .05/sq. ft.
(3)    Adding outlets or fixtures
50.00 + .05/sq. ft.
(4)    New Homes
0 to 2,000 sq.ft.
140.00 + .05/sq. ft.
2,001 to 3,000 sq.ft.
160.00 + .05/sq. ft.
3,001 to 4,000 sq.ft.
180.00 + .05/sq. ft.
4,001 and above
200.00 + .05/sq. ft.
(5)    Replace existing service
75.00
(6)    Remodeling and alterations
75.00 + .05/sq. ft.
(7)    Temporary service
50.00
(h)
Low voltage wiring (base).
70.00
(1)   Phone, cable, data, fire alarm
(Plus $.25/opening)
(i)
Waterproofing: Exterior or interior
$75.00
(j)
Drain Tile Replacement
35.00 + .20/lineal ft.
(k)
Engineering.
(1)   A.   Final rough grade inspection   
500.00
   B.   Final rough grade re-inspections
500.00 (each)
following permit fees are required to be paid at the same time as the payment of the general building permit: plumbing, HVAC, electrical, concrete, fireplace, and other permits as required by the Building Director, unless this requirement is waived by the Building Director. Plumbing, HVAC and electrical permits will not be considered issued until a signed copy of the permit application is in the receipt of the Building Department. Any work started prior to the issuance of this permit is subject to Section 149.09 of the fee schedule and Section 1303.11 of the Building Code.
(l)
Fence. (Over 6 feet tall)
$50.00
(m)
Filling and Grading. 
50.00
(n)
Fireplace. (factory or masonry)
50.00 factory, masonry 75.00
(o)
HVAC.
(1)    Air conditioning.
Replace existing unit
55.00
New unit in existing home
55.00
(2)   Ductwork. Extension of existing
50.00
(3)    Heating.
Replace existing unit
55.00
Install a new or replace existing heating appliance, such as a garage heater, through-the-wall heater, etc.    
45.00
(4)    New system in single family home or two or three unit. (per unit)
0 to 2,000 sq.ft
100.00 + .05/sq. ft.
2,001 to 3,000 sq.ft.
120.00 + .05/sq. ft.
3,001 to 4,000 sq.ft.    
140.00 + .05/sq. ft.
4,001 and above
160.00 + .05/sq. ft.
(Ord. 2020-41. Passed 3-9-20.)
(p)
New Home. (General Building)
Under 2,000 sq.ft.
200.00 base fee .50/ sq. ft.
Under 3,000 sq.ft.
200.00 base fee+ .50/sq. ft.
Under 4,000 sq.ft.
200.00 base fee+ .50/sq. ft.
Plans exam fee (all new homes)
150.00
(q)
Plumbing.
(1)    Additions
70.00 + .05/sq. ft.
(2)    Adding fixtures
45.00 (Plus $4.00/fixture)
(3)    New home.
0 to 2,000 sq.ft.
140.00 + .05/sq. ft.
2,001 to 3,000 sq.ft.
160.00 + .05/sq. ft.
3,001 to 4,000 sq.ft.
180.00 + .05/sq. ft.
4,001 and above
200.00 + .05/sq. ft.
(4)   Water Heater Replacement
55.00
(5) Remodel/Alteration
75.00 + .05/sq. ft.
(r)
Roof Replacement.
Excludes roof repairs less than 100 sq.ft.
75.00
(s)
Siding.   
75.00
(t)
Swimming Pool.
100.00 above ground, 150.00 in-ground
(u)
Alterations, remodeling, structural repairs of any existing buildings or structures where no additional floor space is added
100.00 + .10/sq. ft.
(Ord. 2020-54. Passed 3-23-20; Ord. 2021-08. Passed 1-11-21; Ord. 2022-36. Passed 2-28-22.)
   149.05 INSPECTION FEES AND EXTRAORDINARY AND SUPPLEMENTAL INSPECTION AND TIME CHARGES.
 
(a)
Reinspection fees for failed inspections and incomplete work requiring additional inspections
$ 75.00
(b)
Extraordinary and supplemental inspections not specified
50.00
(c)
Inspections scheduled for Monday through Friday after 7 p.m. or for any and all inspections completed on a Saturday, Sunday or Holiday (Electrical, HVAC, Plumbing, Building)
125.00
(Ord. 2022-36. Passed 2-28-22.)
   149.06 FEE FORMULA.
   (EDITOR’S NOTE: Former Section 149.06 was repealed by Ordinance 2012-136, passed December 10, 2012.)
Loading...