149.02 BUILDING SCHEDULE OF FEES, COMMERCIAL AND INDUSTRIAL. 
(a)
Accessory Buildings. (Over 200 sq.ft.)
$175.00 includes plan exam fee
(b)
Appeal. As specified and payable to the Board of Building Standards
(c)
Asphalt.
(1)    Installation and repairs up to 3,000 sq.ft
100.00
(2)    For each 1,000 square feet or fraction
thereof in excess of 3,000 sq.ft.
10.00
(d)
Concrete.
(1)    For public and private sidewalks, aprons,
driveways and parking lots up to 3,000 SF
100.00
and for each 1,000 SF or fraction thereof inexcess of 3000 SF
10.00
(e)
Decks. 
75.00
(f)
Demolition.Buildings or structures per 5,000 sq. ft.
200.00 + .50 per 100 sq. ft.
(1)   Interior and partial demolition
200.00 + .50 per 100 sq. ft.
(g)
Electrical.
(1) Additions
130.00 + .05/sq. ft.
(2)    Adding outlets or fixtures
80.00
(3)    Adding circuits for machinery
80.00
(4)    New Buildings
250.00 + .05/ sq. ft.
(5)    Replace existing service
150.00
(6)    Remodeling
75.00 + .05/sq. ft.
(7)    Swimming pool
Above 100.00, In-ground 150.00
(8)    Temporary service
75.00
(h)
Low Voltage Wiring.
(1)   Phone, cable, data, fire alarm
120.00 (Plus $.03/sq. ft.)
Fee Payment. The following permit fees are required to be paid at the same time as the payment of the general building permit: plumbing, HVAC, electrical, concrete, fireplace, storm sewer and other permits as required by the Building Director, unless this requirement is waived by the Building Director. Plumbing, HVAC and electrical permits will not be considered issued until a signed copy of the permit application has been received by the Building Department. Any work started prior to the issuance of this permit is subject to Section 149.09 and Section 1303.11 of the Building Code.
(i)
Fence. (Over 6 feet tall)
65.00 includes post hole inspection
(j)
(EDITOR'S NOTE: Former subsection (j) was deleted by Ordinance 2022-36, passed February 28, 2022.)
(k)
Fireplace. (factory or masonry)
factory-50.00, masonry 75.00
(l)
Fire Protection.
(1)    Hood suppression
$150.00 + $3.00 per sprinkler head
(2)    Sprinklers - base fee
150.00
New Construction
150.00 plus $.10/sq. ft.
Changing heads
150.00 plus $.10/sq. ft.
(m)
HVAC.
(1)    Air conditioning.
Replace existing unit
$75.00
New unit in existing building
75.00
New building
(See new construction)
(2)    Combination units.
Replace existing units
125.00
Install new units in an existing building
125.00
(3)    Ductwork.
50.00 + .05/sq. ft.
(4)    Heating.
Replace existing unit
75.00
New unit in existing building
75.00
Space heaters such as a radiant garage heater or through-the-wall heater (new or replacement)
75.00
(5)    New Construction for Heating and Air Conditioning.
150.00 + .10/sq. ft.
(6)   Additions
100.00 + .05/sq. ft.
(n)
Plumbing.
(1)    Base fee
240.00 + .10/sq. ft.
(2)    Remodeling
75.00 + .10/sq. ft.
(3)    Repairs/alterations
75.00
(4)    Swimming pool
75.00
(5)    Water heater (New or Replacement)   
75.00
(6)   Lawn sprinkler system
75.00 (Plus $4.00 per head)
(Plus $0.04/sq. ft.)
(o)
Roofing. For replacing existing roof per building
110.00 + .03/sq. ft.
(p)
Siding. For re-siding an existing builidng
110.00 + .03/sq. ft.
(q)
Structural.  
(1) Addition
200.00 + .10/sq. ft.
(2)    New building
200.00 + .10/sq. ft.
(3)    Remodeling (including non-structural)
200.00 + .10/sq. ft.
(4)   Building Permit
200.00 + .10/sq. ft.
(r)
Swimming Pool.
In Ground 150.00, above 100.00
(s)
(EDITOR'S NOTE: Former subsection (s) was deleted by Ordinance 2022-36, passed February 28, 2022.)