CHAPTER 1359
Excavation, Foundation and Backfill
1359.01    Compliance required.
1359.02    Safety precautions during excavation.
1359.03    Maintenance of excavations.
1359.04    Preparation of excavations.
1359.05    Backfilling and seeding.
1359.06    Clearing and care of surface materials.
1359.07    Trench excavations.
1359.08    Structure excavations.
1359.09    Excavation for roadways, pavements and sidewalks.
1359.10    Rock excavation.
1359.11    Protection of excavations; sheeting and bracing.
1359.12    Protection against water.
1359.13    Unauthorized excavations.
1359.14    Additional excavations.
1359.15    Foundations.
1359.16    Steel sheet piling.
1359.17    Disposal of excavated material.
1359.18    Backfilling.
1359.19    Embankments and fills.
1359.20    Short tunnel construction.
1359.21    Placing of topsoil and grading.
1359.22    Seeding.
1359.23    Restoration of paved surfaces.
1359.24    Grading.
 
CROSS REFERENCES
Excavation liability - see Ohio R.C. 723.49 et seq.
Excavations - see S.U. & P.S. Ch. 919
Excavation and subgrade - see BLDG. 1363.02