The sites of all excavations and embankments shall first be cleared of all trees, except those designated by the Engineer to be saved, stumps, brush, rubbish or other surface material, which shall be removed and disposed of in a manner satisfactory to the Engineer. All topsoil, loam and similar material covering the areas to be excavated shall be removed and kept separate and compactly piled for use in resurfacing as may be directed. All trees and shrubbery designated by the Engineer to be saved shall be adequately protected by boxes in a manner approved by the Engineer.