1359.14 ADDITIONAL EXCAVATIONS.
   If the materials encountered in any excavation are not suitable for structural foundations, or, if necessary to go an additional depth or width from that designated on the drawings to provide proper bearing for pipe or masonry, or to construct pile or plank foundations, the contractor shall make such additional excavations outside the regular limits of the work as may be directed by the Engineer.
(Ord. 352. Passed 10-22-62.)