Excavation for roadways, pavements and sidewalks shall be made in accordance with the lines, grades and cross-sections shown on the drawings. Unstable and unsuitable materials found existing in the subgrade of the improvement shall be excavated and removed and replaced with a stable material, satisfactory to the Engineer.
(Ord. 352. Passed 10-22-62.)