In all streets or parts of streets that are paved or macadamized, all the backfilling shall consist of porous material and be well compacted. After the trench has been backfilled to the required height, then the subgrade for the new paving shall be further compacted by rolling the backfill at paving subgrade elevation. The pavement shall then be relaid carefully and thoroughly to the section and of the materials originally placed, and to the satisfaction of the Engineer.
When requested by the Engineer, the contractor shall clean up and restore the pavement or subgrade in sections upon completion of any given section of sewer or water main and not upon final completion of all the sewers or water mains.
When the work is completed, all surplus material, rubbish, etc., shall be removed and the surface of each street disturbed by construction under the contract shall be left in as good condition as it was before the commencement of the work, and it shall be promptly and regularly maintained in such condition during a period of one year after the acceptance of the work.
(Ord. 352. Passed 10-22-62.)