18.64.100: DEMOLITION REQUIREMENTS:
   A.   Prior to the commencement of any demolition or moving, the permittee shall plug all sewer laterals at or near sidewalk lines as staked out by the department of public utilities. No excavation shall be covered until such plugging is approved by the department or by the building official. The permittee shall further ensure all utility services to the structure and/or premises have been shut off and meters removed prior to commencement of demolition work.
   B.   When the applicant indicates the demolition will require more than thirty (30) days to complete, and where required by the building official for the safety of the public, the applicant shall also provide plans to fence the demolition site so that it is inaccessible to unauthorized persons in a manner acceptable to the building official. The building official may waive the fencing requirement if it is determined that fencing would be inappropriate or unnecessary to protect safety or health.
   C.   A permit for demolition shall require that all materials comprising part of the existing structure(s), including the foundation and footings, be removed from the site. Unless otherwise approved under a building permit for redevelopment of the site, the depression caused by the removal of such debris shall be filled back and compacted to the original grade, as approved by the building official, with fill material excluding detrimental amounts of organic material or large dimension nonorganic material.
   D.   Permitted demolition work, including filling and leveling back to grade and removal of required pedestrian walkways and fences, shall be completed within the permit period unless the building official finds that any part of the foundation of building or site will form an integral part of a new structure to be erected on the same site for which plans have already been approved by the building services and licensing division. In such event, the building official may approve plans for appropriate adjustments to the completion time and may impose reasonable conditions including the posting of a bond, erection of fences, securing, or similar preventions to ensure the site does not create a hazard after the demolition is completed. (Ord. 53-20, 2020)