18.64.070: PREDEMOLITION SALVAGE PERMITS:
   A.   A predemolition salvage permit shall be required for removal of doors, windows, special glass, fixtures, fittings, pipes, railings, posts, panels, boards, lumber, stones, bricks, marble, or similar materials on the exterior or interior of any building prior to demolition of the structure. A predemolition salvage permit may be issued only contemporaneously with, or after, city approval of:
      1.   A building permit for new construction on the premises following demolition, or
      2.   A demolition permit.
   B.   A predemolition salvage permit fee shall be as shown on the Salt Lake City consolidated fee schedule. (Ord. 53-20, 2020)