§ 158.054 EARLY COMPLETION OF DETENTION FACILITIES.
   Where detention, retention, or depressional storage areas are to be used as part of the drainage system for a property, they shall be constructed as the first element of the initial earthwork program. Any eroded sediment captured in these facilities shall be removed by the applicant before project completion in order to maintain the design volume of the facilities. Gravity is not feasible. Pre-sedimentation basins shall be included, where feasible, for localizing sediment deposition and removal. Access for heavy equipment shall be provided.
(Ord. 04-02, § 158.017, passed 4-5-04)