§ 154.10 DEMOLISHED STRUCTURES; LEVELING AND FILLING.
   Whenever a building or structure has been demolished, the foundation thereof, if any, shall be leveled to at least 42 inches below grade and filled in with 95% noncombustible fill material, with the top 42 inches of fill material being of dirt, sand, or gravel; and no combustible material may be placed in the foundation which is not from the site. The fill material must be capable of supporting vegetative growth.
(1969 Code, § 6-59) (Ord. 1994-10, passed 4-11-1994; Am. Ord. 1997-7, passed 2-24-1997) Penalty, see § 154.99