Loading...
§ 154.10 DEMOLISHED STRUCTURES; LEVELING AND FILLING.
   Whenever a building or structure has been demolished, the foundation thereof, if any, shall be leveled to at least 42 inches below grade and filled in with 95% noncombustible fill material, with the top 42 inches of fill material being of dirt, sand, or gravel; and no combustible material may be placed in the foundation which is not from the site. The fill material must be capable of supporting vegetative growth.
(1969 Code, § 6-59) (Ord. 1994-10, passed 4-11-1994; Am. Ord. 1997-7, passed 2-24-1997) Penalty, see § 154.99
§ 154.11 COMPLETION; INSPECTION.
   Upon completion of the demolition and backfill and leveling of the property, the owner shall notify the Building Inspector of the completion, and the Building Inspector shall issue a certificate of acceptance of the demolition. All demolition work must be completed within 90 days of the issuance of the demolition permit.
(1969 Code, § 6-60) (Ord. 1994-10, passed 4-11-1994) Penalty, see § 154.99
§ 154.99 PENALTY.
   (A)   Any person who shall violate any provision of this chapter for which no other penalty is provided shall be subject to penalties as provided in § 10.99 of this code.
   (B)   Any person, firm, or corporation violating any provision of this chapter shall be fined not less than $5 nor more than $500 for each offense, and a separate offense shall be deemed committed on each day during or on which a violation occurs or continues.
(1969 Code, § 6-61) (Ord. 1994-10, passed 4-11-1994)