1025.6.2 Figures.
The figures in Appendix S are intended only for illustration, and where there is a conflict between the figures and this section, this section shall govern.
1025.7 Voluntary installation.
Where luminous egress path markings are not required but are voluntarily installed in the exit path, such markings shall comply with Section 1025.
1025.8 Special Inspection.
Luminous exit path markings shall be subject to special inspection in accordance with Sections 1025.8.1 through 1025.8.3.
1025.8.1 Inspection.
A registered design professional shall verify by visual inspection that all components have been installed in accordance with Section 1025, both with the normal lighting turned on and with the normal and emergency lighting turned off.
1025.8.2 Product identification.
A registered design professional shall review the manufacturer product literature and information from the testing agency and verify that the products installed are labeled as meeting the standards in Section 1025.4. The registered design professional shall verify which particular products were installed in which parts of the building.
1025.8.3 Paints.
Where in situ painting was utilized, a registered design professional shall field-verify that the specified paint was utilized in accordance with the manufacture-recommended methods of application.
1025.9 Maintenance program.
Owners shall keep the required luminous egress path markings in good repair. At a minimum, owners shall, every 12 months, perform a visual inspection of the markings with the normal lighting turned on. Markings that are missing, damaged, loose, or that show signs of wear or missing labels shall be noted and promptly repaired. The log of such inspections, including the results and any corrective measures taken, shall be kept and maintained on the premises for inspection by the department and the Fire Department. The log shall contain the date of inspection and the printed name and signature of the person performing the inspection.