Section
General Provisions
77.01 Permit required for sidewalk construction
77.02 Streets not to be damaged
77.03 Moving of houses
77.04 Damage to municipal property
77.05 Construction of concrete curbs, gutters or sidewalks outside of subdivisions
77.06 Construction of curb cuts and new driveways
77.07 Improvements or replacement of existing concrete curbs, gutters, sidewalks or existing driveways
77.08 Extension of streets to other than newly subdivided lots
77.09 Street closings
Excavation and Repair
77.20 Permit provisions
77.21 Street repair
77.22 Leaving excavations unprotected
77.23 Supervision and control
77.24 Disposition of fees
Obstructions
77.35 Covers for openings or stairways to cellars
77.36 Curb service
77.37 Playing games in streets prohibited
Use and Cleanliness
77.50 Littering
77.51 Maintenance of public areas
77.52 Maintenance of portions of street right-of-way
Utility Poles and Wires
77.65 Permit prerequisite to placing of utility poles
77.66 Agreement as to maintenance of wires of different companies on same poles
GENERAL PROVISIONS
No sidewalk of any description shall be built by any person, of any brick, wood or other material, without a written permit from the city.
('84 Code, § 23-1) Penalty, see § 10.99
(A) It shall be unlawful for any person to drag, or run, or cause to be dragged or run any harrow or other implement, engine, machine or tool upon any asphalt, bitulithic, warrenite or other type of per-manently paved street of the city which shall be liable, in any way to injury or cut the surface thereof.
(B) It shall also be unlawful to injure any dirt street in the same manner.
('84 Code, § 23-2) Penalty, see § 10.99
No person shall move any house or building upon or across the public streets or sidewalks until the following procedures have been complied with:
(A) An application for a house moving permit must be submitted to the Zoning Officer.
(B) A building permit must be obtained.
(C) The Zoning Officer must receive approval for the moving route from the Director of Energy Services and the City Engineer.
(D) A moving permit must be issued and the permit fee paid. The fee shall be according to a schedule for such permits, established by the City Council and on file at the city hall, which schedule is hereby adopted as though set out in full herein.
('84 Code, § 23-3) Penalty, see § 10.99
No person shall injure, tamper with, remove or paint upon or deface any bridge, culvert, ditch and drain, sign, signpost, street light, traffic sign or bulletin board or other municipal property upon the streets and sidewalks except employees of the city in performance of their duties.
('84 Code, § 23-4) Penalty, see § 10.99
In the construction of concrete curbs, gutters and sidewalks, the city will furnish the labor and will construct the curbs, gutters and sidewalks for not less than one block; provided, that the property owners in such block pay for the materials used; or pay one-half of the total cost if installed by contract. This section shall not be construed to apply to subdivisions.
('84 Code, § 23-5) (Ord. passed 6-17-86)
When a curb is to be cut and a new driveway constructed, the property owner involved shall pay the entire cost of cutting the curb and constructing the new driveway, after the curb cut has been approved by the State Highway Department and the city.
('84 Code, § 23-6)
Loading...