(A) Applicable: This rate is available to all commercial and industrial establishments for lighting, heating, cooking and power.
(B) Character of service: Standard 3 or 4 wire, single or three phase, secondary voltage, alternating current, 60 hertz (cycles per second).
(C) Minimum customer charge per month:
Single Phase | Three Phase | |
Per meter per month: | $25.00 | $35.00 |
(D) Demand charge (per kW):
For each kilowatt of billing demand, per month, per kW: $12.00
(E) Energy charges:
For each kilowatt-hour, per month, per kWh: $0.0800
(F) Excise (kilowatt-hour) tax adjustment: For all customers located outside the village's corporation limits, the rates set forth above shall be increased by an amount equal to excise (kilowatt-hour) tax imposed on the village's electrical distribution system under R.C. § 5727.81. Said increase shall become effective with the bills that include May 1, 2001 as part of the usage period and shall be automatically adjusted to reflect any change in the kilowatt-hour tax imposed by R.C. § 5727.81.
(G) Power cost adjustment: The above rates shall be adjusted in accordance with the power cost adjustment set forth in § 54.07.
(H) Primary voltage service: When service is supplied and metered at the option of the village 7,200/12,500 volts, the computed charges for demand and energy shall be subject to a 1% discount of total bill.
(I) Delayed payment charge: Ten percent shall be added to the net bill if not paid full within 15 days after rendition of bill for said service.
(J) On-site generation: On-site generating capacity will be limited to customer's estimated peak load. Where on-site generation is installed, the monthly billing demand will be equal to the billing demand that would have been billed absent the on-site generation.
(K) Terms and conditions:
(1) A minimum monthly contract service charge and minimum contract term may be established by the village to consumers having abnormal demand requirements (less than 150 hours use of maximum demand per month).
(2) If a consumer has low power factor (less than 85% lagging); at the time of maximum demand, then such power factor shall be corrected by the consumer at the consumers expense within 60 days upon written notice received from the village or the village may increase the billing demand by l% for each 1% the power factor is below 85%.
(3) All electric service of the village is rendered under and subject to the general service rules and regulations of the village as amended from time to time.
(Ord. 10-02-02, passed 3-2-10; Am. Ord. 15-03-01, passed 4-21-15; Am. Ord. 15-06-01, passed 6-16-15; Am. Ord. 21-03-01, passed 4-6-21)