Loading...
A plumbing inspection fee shall be required in the amount of $200 per unit on all residential structures constructed in the village. The fee shall be required prior to the issuance of a building permit. The fee shall include four inspections, and each additional inspection shall be $50. The plumbing inspection fee on commercial and industrial structures shall be determined on a case-by-case basis as estimated by the Village Zoning Officer.
(Ord. 1999-2, Building § 3, subs. .050, passed 2-15-1999; Ord. 2005-3, passed 2-7-2005; Ord. 2018-06, passed 10-1-2018)
(A) An electrical inspection fee shall be required in the amount of $200 per unit on all residential structures constructed in the village. The fee shall be required prior to the issuance of a building permit. The fee shall include four inspections, and each additional inspection shall be $50. The electrical inspection fee on commercial and industrial structures shall be determined on a case-by-case basis as estimated by the Village Zoning Officer.
(B) An electrical inspection fee of $100 shall be required for any updated or new service to all residential structures in the village that have previously obtained an electrical inspection fee prior to the issuance of a building permit. The electrical inspection fee includes two inspections, and each additional inspection, as needed, is $50.
(Ord. 1999-2, Building § 3, subs. .060, passed 2-15-1999; Ord. 2003-3, passed 3-17-2003; Ord. 2005-3, passed 2-7-2005; Ord. 2018-06, passed 10-1-2018; Ord. 2020-05, passed 9-21-2020)
A water impact fee in the amount of $1,000 shall be required on all residential, commercial and industrial structures. The sum shall be imposed on a per-unit basis, and shall be payable prior to the issuance of a building permit. The fee shall be separate, distinct and in addition to any water tap-on fee, water tower fee or other fees which may be required from time to time by the village authorities, and shall be imposed on all new construction initiated in the village.
(Ord. 1999-2, Building § 3, subs. .070, passed 2-15-1999; Ord. 2005-3, passed 2-7-2005; Ord. 2018-06, passed 10-1-2018)
A sewer impact fee in the amount of $1,000 shall be required on all residential, commercial and industrial structures. The sum shall be imposed on a per-unit basis, and shall be payable prior to the issuance of a building permit. The fee shall be separate, distinct and in addition to any sewer tap-on fee which may be required from time to time by the village authorities, and shall be imposed on all new construction initiated in the village.
(Ord. 1999-2, Building § 3, subs. .080, passed 2-15-1999; Ord. 2005-3, passed 2-7-2005; Ord. 2018-06, passed 10-1-2018)
A water tap-on fee shall be required in the amount of $900 per unit. The sum shall be due and payable prior to the issuance of a building permit on new construction within the village. The fee shall be considered separate, distinct and in addition to a water impact fee, water tower fee or other fees required herein. The water tap-on fee shall include the cost of a water meter.
(Ord. 1999-2, Building § 3, subs. .090, passed 2-15-1999; Ord. 2005-3, passed 2-7-2005; Ord. 2018-06, passed 10-1-2018)
A sewer tap-on fee shall be required in the amount of $800 per unit. The sum shall be due and payable prior to the issuance of a building permit on new construction within the village. The fee shall be considered separate, distinct and in addition to a sewer impact fee or other fees required herein.
(Ord. 1999-2, Building § 3, subs. .100, passed 2-15-1999; Ord. 2005-3, passed 2-7-2005; Ord. 2018-06, passed 10-1-2018)
A water tower fee shall be required in the amount of $250 per unit. The sum shall be due and payable prior to the issuance of a building permit on new construction within the village. The fee shall be considered separate, distinct and in addition to a water tap-on fees, water impact fees or other fees required herein.
(Ord. 1999-2, Building § 3, subs. .110, passed 2-15-1999; Ord. 2005-3, passed 2-7-2005; Ord. 2018-06, passed 10-1-2018)
Loading...