§ 151.052 BUILDING PERMIT FEES.
   All applicants for a building permit shall pay and the Building Officer shall charge and collect the building fees with respect to applications for, the issuance of permits for, and the inspection and supervision of, the construction, alteration and repair of buildings and other structures, in accordance with the following schedule.
   (A)   Residential construction (single-family only).
      (1)   For new construction, including wiring and plumbing, the building permit fee shall be $100.
      (2)   For additions, incidental or accessory buildings and/or structures, including wiring and building, the building permit fee shall be $100.
      (3)   For additions, incidental or accessory buildings and/or structures, the building permit fee shall be $50.
      (4)   For alterations, remodeling or other structures, not including any addition to existing buildings, which will add to the ground area thereof, the building permit fee shall be $100 plus $0.30 per square foot. The fee shall include four inspections, and each additional inspection shall be $50.
   (B)   Residential (multi-family).
      (1)   For new construction, including wiring and plumbing, the building permit fee shall be $100.
      (2)   For additions, incidental or accessory buildings and/or structures, including wiring and plumbing, the building permit fee shall be $100.
      (3)   For additions, incidental or accessory buildings and/or structures, the building permit fee shall be $50.
      (4)   For alterations, remodeling or other structures, not including any additions to existing buildings which will add to the ground area thereof, the building permit fee shall be $100 plus $0.30 per square foot. The fee shall include four inspections, and each additional inspection shall be $50.
   (C)   Commercial, industrial, storage and institutional buildings. All new construction, including grading, foundations, buildings, pipe plumbing/water supply, electrical/communications, waste disposal systems, all industrial-type facilities, and all other items required for the project, when shown on the initial or supplemental application for permit and/or the data attached thereto.
      (1)   New construction. A fee of $5 per 100 square feet, or portion thereof, for all floor area, including basements, additions to buildings, and/or other structures and improvements, with a minimum fee of $50.
      (2)   Changes of existing buildings. For alterations, remodeling and changes to existing facilities, but not including additions to existing buildings that increase the floor area, the building permit fee shall be $5 per 100 square feet altered, with a minimum fee of $50.
      (3)   Separate construction. When items or facilities are installed or major repairs are made separately and are not included in either division (C)(1) or (C)(2) above, then the building permit fee shall be $1 for each $1,000 of estimated total cost, with a minimum fee of $50.
(Ord. 1999-2, Building § 3, subs. .030, passed 2-15-1999; Ord. 2018-06, passed 10-1-2018) Penalty, see § 151.999