When any person shall desire an inspection and/or report for any existing building or part thereof, or other special services, a fee of thirty dollars ($30.00) per hour or portion thereof shall be charged for such inspection or services, report preparation, or other requested presentations.
(Ord. 39-06. Passed 11-6-06.)
Permit fees provide for customary inspections only. Where additional inspections or trips are made necessary by incomplete or faulty work, or because of an incorrect address given or failure to keep an appointment, or for similar reasons, no fee shall be charged for the first reinspection but a fee of fifteen dollars ($15.00) may be charged at the discretion of the Building Inspector for each additional such reinspection or extra trip.
(Ord. 39-06. Passed 11-6-06.)
Fees for electrical permits shall conform to the following table:
Processing/Application Fee | $15.00 |
Special Inspection Fee (survey fees/fire damage) | 30.00/hour |
Additional Three percent (3%) pursuant to Ohio Building Code for Commercial projects: | |
Additional One percent (1%) pursuant to Residential Code of Ohio for Residential projects: | |
Service | Fee (Each) |
New Service/Change/Reconnect - 60 - 200 amp | 20.00 |
New Service/Change/Reconnect - 201 - 400 amp | 25.00 |
New Service/Change/Reconnect - 401 - 1000 amp | 35.00 |
New Service/Change/Reconnect - 1,001 amp & up | 55.00 |
Residential Pre-heat Service Release | 20.00 |
Alteration/Repairs (each 10 openings) | 20.00 |
Additional sub-service/meter (each) | 20.00 |
Sub-panels (each) | 20.00 |
Temporary Pole (each) | 20.00 |
Trench/Ceiling/Slab (each) | 20.00 |
Rough Inspection | 20.00 |
Final Inspection | 20.00 |
2 wire circuit/Feeders (each) | 2.50 |
3 wire circuit/Feeders (each) | 2.50 |
Pool (Above ground) | 25.00 |
Pool (In ground) | 50.00 |
Transformers/Generators (each) | 25.00 |
Motor/Starters/Disconnects (each) | 5.00 |
Re-inspection Fee | 20.00 |
Commercial Electric Plan Review | (current hourly rate) |
(Ord. 39-06. Passed 11-6-06.)
The minimum fee for any electrical reinspection shall be twenty dollars ($20.00). Where additional inspections or trips are made necessary by incomplete or faulty work, an incorrect address given, or failure to keep an appointment, or similar reasons, no fee shall be charged for the first reinspection but a fee of twenty dollars ($20.00) may be charged at the discretion of the Building Official for each additional reinspection or extra trip.
(Ord. 39-06. Passed 11-6-06.)
The fee for making necessary investigations prior to issuance of an electrical permit shall be equal to the fee for such permit and shall be in addition thereto, but in no event shall such investigation fee exceed five hundred dollars ($500.00).
(Ord. 39-06. Passed 11-6-06.)
Fees for mechanical permits shall conform to the following table:
Processing/Application fee | $15.00 |
30.00/hour | |
Additional Three percent (3%) pursuant to Ohio Building Code for Commercial projects: | |
Additional One percent (1%) pursuant to Residential Code of Ohio for Residential projects: | |
Mechanical/HVAC Permit Table Applicable to Residential and Commercial | Fee (Each) |
20.00 | |
** Rough inspection (i.e. trench, above ceiling) | 20.00 |
** Final inspection | 20.00 |
* Replacement or new furnace/AC/heat pumps existing residential (each) | 15.00 |
New Furnace/AC/heat pumps new residential (each) | 15.00 |
Exhaust fans (each) | 10.00 |
* Duct work extensions or re-locations, remodel and additions only | 10.00 |
*Fireplace inserts/gas, wood or propane or liner install (each) | 20.00 |
Unit heaters/miscellaneous equipment (each) | 15.00 |
All Fuel gas piping including LP gas | 25.00 |
Each additional gas meter or opening | 5.00 |
Fuel Gas pressure test (Kuhlman or time clock) | 20.00 |
Heating and cooling (interior or roof top units, (each) | 25.00 |
Smoke detector shut down | 20.00 |
Fire dampers (1-10)
| 20.00 |
Hydronic & refrigeration systems | 35.00 |
Exhaust systems for garages, kitchen hoods or similar systems | 35.00 |
*Note: Cost of permit includes one inspection
**Note: Inspection is limited to two (2) trips; initial inspection and one (1) re-inspection, if required. Any subsequent inspections will require payment of a re-inspection fee of twenty ($20.00) dollars before any re-inspection can be made.
(Ord. 39-06. Passed 11-6-06.)
Permit inspection fees provide for customary inspection only. Where additional inspections are made necessary by incomplete or faulty work, or because of an incorrect address given, or failure to keep an appointment, or for similar reasons, no fee shall be charged for the first re-inspection, but a fee of twenty dollars ($20.00) may be charged at the discretion of the Building Official or his designee for each additional re-inspection or extra trip.
(Ord. 39-06. Passed 11-6-06.)
(Ord. 39-06. Passed 11-6-06.)
In addition to any other fees specified in this chapter, any person or persons submitting plans requiring review under the Ohio Building Code shall pay a plan review fee. Prior to issuance of a building permit, the plan review fee shall be assessed at the current City contractor hourly rate for plan review, and is based upon time necessary for the particular plan review. Any actual costs for transporting or otherwise processing plans shall also be charged.
(Ord. 39-06. Passed 11-6-06.)