109.02  DIVISION OF ENGINEERING.
   Fees charged by the Division of Engineering shall be as follows:
(a)   Excavation Permits.
 
In tree lawn
$0.00 deposit
 
Cutting pavement (less than 16 feet in length)
$400.00 deposit
 
Cutting pavement (16 feet to 40 feet in length)
$500.00 deposit
 
Cutting pavement (over 40 feet in length)
$600.00 deposit
(b)   Fee to be Retained by City.
 
Tree lawn excavation
$0.00
 
Cutting pavement
$100.00
(c)   Sale of Plans and Bidding Documents.
$25.00 minimum
 
(No additional charges for number of sheets.)
(d)   Mailing Fee for Plans and Bidding Documents.
$15.00 minimum
 
(NOTE:  The Engineering Department may mail the above items and bill the contractor for the fee.)
 
Photocopies of the plan holders list may be furnished to interested parties without charge.
 
One set of plans and specifications may be furnished to construction information organizations  requesting the materials without charge.
(e)   City Standard Drawings Book.
$20.00 each
(f)   City Construction and Material Specification Book.
$15.00 each
(g)   Copy of Record Drawings.
$2.00 each
 
(NOTE:  Copies of record drawings may be furnished to the consultant and/or contractors working for the City  without charge.  Copies of record drawings  showing City facilities may be furnished to the utilities owner or contractors working in the public right-of-way without charge.)
(h)   Sanitary Sewer Impact Fee for the Pioneer Ridge Subdivision.
$1,500.00 per unit due at the time of issuing building permit.
(i)   Capital Recovery Fee for the West Ridge Estate Pump Station.
 
Every new construction after July, 2003 which will be discharged through West Ridge Estate Pump Station will be subject to a capital recovery fee as below:
 
 
(1)   Single-family residential house
$1,000.00 per unit
 
(2)   One-bedroom apartment/condo/cluster home
$500.00 per unit
 
(3)   Two-bedroom apartment/condo/cluster home
$600.00 per unit
 
(4)   Three-bedroom apartment/condo/cluster home
$700.00 per unit
(5)   Any commercial establishment
$150.00 per unit or amount for usage at the rate of $215.00 per gpm, whichever is greater
(j)   Capital Recovery Fee for Chestnut Ridge Development.
 
Every new construction east of easterly property line of Chestnut Ridge Road Development No. 1 Subdivision , within the City of Elyria corporation line, connected to existing sanitary sewer on Fieldstone Drive, shall be subject to a capital recovery fee as follows:
 
 
(1)   Single-family residential house
$1,000.00 per unit
 
(2)   One-bedroom apartment/condo/cluster home
$500.00 per unit
 
(3)   Two-bedroom apartment/condo/cluster home
$600.00 per unit
 
(4)   Three bedroom apartment/condo/cluster home
$700.00 per unit
 
(5)   Any commercial establishment
$150.00 per unit or amount for usage at the rate of $215.00 per gpm, whichever is higher.
(k)   Capital Recovery Fee for the SouthEast Interceptor Sewer.
 
Every connection within the City of Elyria for sewer service to and within the SouthEast Interceptor Sewer Service Area shall be subject to a capital fee of $1,000.00 in addition to all other fees required under Section 933.03 of these Codified Ordinances.
(l)   Capital Recovery Fee for the Murray Ridge Sanitary Sewer.
 
Any property or properties which are connected to and discharged into the sanitary sewer installed along Murray Ridge Road as per plans prepared by City Engineer in November 2005 shall be subject to capital recovery fees in addition to all other fees required under Section 933.03 of these Codified Ordinances and as below:
 
(1)   Single-family house without lateral:
$1,500.00 per unit
 
(2)   Single-family house with lateral (long):
$4,300.00 per unit
 
(3)   Single-family house with lateral (short):
$2,626.00 per unit
 
(4)   Any other development:
$2,000.00 per acre
(m)   Capital Recovery Fee for Griswold Road Sanitary Sewer.
 
Any property or properties which are connected to and discharged into the sanitary sewer installed along Griswold Road as per plans prepared by City Engineer shall be subject to capital recovery fees in addition to all other fees required under Section 933.03 of these Codified Ordinances and as below:
 
(1)   Single-family house without lateral:
$1,500.00 per unit
 
(2)   Single-family house with lateral
$3,350.00 per unit
 
(3)   Non-residential
$3,825.00 per unit (min.) - $8,025.00 per unit (max.)
Additional fee computation:
1½” water meter $2,200.00
2" water meter size $4,200.00
 
(4)   Single-family/residential development
$3,000.00 per acre
 
(5)   Commercial/residential development
$7,650.00 per acre
 
plus 4% simple interest annually commencing 1/01/2017 and ending 12/31/2042
(n)   Capital Recovery Fee for Middle Avenue Sanitary Sewer.
 
Any property or properties which are connected to and discharged into the sanitary sewer installed along Middle Avenue as per plans prepared by City Engineer shall be subject to capital recovery fees in addition to all other fees required under Section 933.03 of these Codified Ordinances and as below:
 
(1)   Single-family house without lateral:
$1,500.00 per unit
 
(2)   Single-family house with lateral
$2,750.00 per unit
 
(3)   Commercial/residential development
$2,500.00 per acre
 
plus 4% simple interest annually commencing 1/01/2013 and ending 12/31/2038
 
(Ord. 2016-182. Passed 12-4-17.)