Loading...
Fees charged by the Safety Service Department shall be as follows:
Lot mowing | $300.00 per hour (1 hour min. charge), annual interest as provided by Ohio R.C. 1343.03 |
Massage parlor establishment license | $100.00 per year, per location |
Removal of discarded appliances with freon |
$75.00 per unit |
Mobile food vendor permit fee | |
(Annual fee, from January 1 through December 31) | $25.00 |
Junk yard license | $35.00 |
Junk yard license renewal (all licenses expire on January 1 following the date of issuance) | $25.00 |
Sanitary sewer connection permits: | |
Residential | |
Single-family house (per house) | $750.00 |
Multi-family buildings (per dwelling unit) | |
One bedroom or studio-type | $350.00 |
Two bedroom | $450.00 |
Three bedroom or larger (per lot) | $600.00 |
Mobile home parks (per lot) | $550.00 |
Commercial, Industrial or Institutional | |
New buildings to be used for commercial, industrial, institutional or any other nonresidential purpose shall pay a fee which is the greater of the fee based on the water meter size of the building or the fee based on the square footage of the building, which fee shall be computed as hereinafter provided: | |
New Water Meter Size (in.)
| Fee
|
New Water Meter Size (in.)
| Fee
|
5/8 | $750.00 |
3/4 | $850.00 |
1 | $1,225.00 |
1-1/2 | $2,200.00 |
2 | $4,200.00 |
3 | $9,200.00 |
4 | $20,200.00 |
6 | $40,200.00 |
8 | $70,200.00 |
Square Footage Fee
Commercial, industrial, institutional or any other nonresidential use, except for restaurants, food preparation or processing, the fee shall be $125.00, plus $0.10 for each square foot in excess of 1,250 square feet of new floor area.
For restaurants and buildings used for food preparation or processing the fee shall be $125.00 plus $0.20 for each square foot in excess of 625 square feet of new floor area.
For new commercial or industrial buildings with a restaurant area to be used by the public and located within the building, the fee shall be $125.00, plus $0.10 for each square foot in excess of 1,250 square feet of new floor area, plus an additional $0.10 per square foot of the restaurant area.
All references to square footage area of floor area as provided herein shall include basement, mezzanine or balcony floor space areas in addition to first floor, second floor and any floors above those levels, but shall not include attic floor space area.
Gross floor space shall be computed from the outside dimensions of the buildings with no deductions for wall thickness.
For buildings with more than one story, the area of any stairway shaft or elevator shaft shall be included only once.
Remodeling or Additions to Any Type of Structure
Remodeling work or additions to existing structures shall also be subject to a capital fee if the fee, based on either (1) Residential or (2) Commercial, Industrial or Institutional, is larger for the building after any remodeling or addition is done than the fee would have been for the building before any remodeling or addition is done. The fee to be paid shall be the difference in the fee determined before and after the remodeling or addition is completed.
Lowell Street recovery fee | $35.00 per front ft. of property to be connected to sanitary sewer |
(Ord. 2016-182. Passed 12-4-17.)
(a) Tap Fees for Developers, Allotments, Contractors; Making Taps in New Developments:
Tap Size | Meter Size | Meter Cost | Construction Water | Capital Recovery Fee | Time & Materials | City Total | Outside City Total |
Tap Size | Meter Size | Meter Cost | Construction Water | Capital Recovery Fee | Time & Materials | City Total | Outside City Total |
1 Inch | 3/4 Inch | $382.50 | $64.00 | $500.00 | N/A | $946.50 | $1,183.13 |
1" Dbl. Head | 3/4" x 2 | $765.00 | $64.00 | $700.00 | N/A | $1,529.00 | $1,911.25 |
1 Inch | 1 Inch | $455.23 | $64.00 | $500.00 | N/A | $1,019.23 | $1,274.04 |
1½ Inch | 1 Inch | $455.23 | $95.00 | $600.00 | N/A | $1,150.23 | $1,437.79 |
1½ Inch | 1½ Inch | $694.61 | $95.00 | $600.00 | N/A | $1,389.61 | $1,737.01 |
2 Inch | 1½ Inch | $694.61 | $160.00 | $750.00 | N/A | $1,604.61 | $2,005.76 |
Tap permits are issued only with written application and approval of the City of Elyria. Developers must use all City approved materials. Developers must maintain tap and curbstop until occupancy. | |||||||
(b) Water Distribution Installed Taps on Cast and Ductile Mains.
Tap Size | Meter Size | Meter Cost | Construction Water | Capital Recovery Fee | Time & Materials | City Total | Outside City Total |
Tap Size | Meter Size | Meter Cost | Construction Water | Capital Recovery Fee | Time & Materials | City Total | Outside City Total |
1 Inch | 3/4" | $382.50 | $64 | $500 | $1549.01 | $2495.51 | $3119.39 |
1" Dbl. Head | 3/4" x 2 | $765.00 | $64 | $700 | $1655.96 | $3184.96 | $3981.20 |
1½" | 1 Inch | $455.23 | $95 | $600 | $2083.07 | $3233.30 | $4041.63 |
1½" | 1½" | $694.61 | $95 | $600 | $2083.07 | $3472.68 | $4340.85 |
2 Inch | 1½" | $694.61 | $160 | $750 | $2547.10 | $4151.71 | $5189.64 |
2 Inch | 2 Inch | $863.89 | $160 | $750 | $2547.10 | $4320.99 | $5401.24 |
Tap permits are issued only with written application and approval of the City of Elyria. Time and material rates are set January 1st of the calendar year based on actual cost. Materials are an average for a normal situation. Actual fee may be different. Material prices are actual with a 15% handling fee set by ordinance. Fees do not include any special assessments or capital recovery situations set by ordinance. | |||||||
(c) Water Distribution Installed Taps on Prestressed Cylinder Pipe.
Tap Size | Meter Size | Meter Cost | Construction Water | Capital Recovery Fee | Time & Materials | City Total | Outside City Total |
Tap Size | Meter Size | Meter Cost | Construction Water | Capital Recovery Fee | Time & Materials | City Total | Outside City Total |
1 Inch | 3/4" | $382.50 | $64 | $500 | $2826.7 3 | $3773.23 | $4716.54 |
1" Dbl. Head | 3/4" x 2 | $765.00 | $64 | $700 | $3050.9 8 | $4579.98 | $5724.98 |
1½" | 1 Inch | $455.23 | $95 | $600 | $3480.7 9 | $4631.02 | $5788.78 |
1½" | 1½" | $694.61 | $95 | $600 | $3480.7 9 | $4870.40 | $6088.00 |
2 Inch | 1½" | $694.61 | $160 | $750 | $3944.82 | $5549.43 | $6936.79 |
2 Inch | 2 Inch | $836.89 | $160 | $750 | $3944.82 | $5691.71 | $7114.64 |
4 Inch | 4 Inch | $3736.36 | N/A | $1000.00 | N/A | $4736.36 | $5920.45 |
6 Inch | 6 Inch | $5182.48 | N/A | $1400.00 | N/A | $6582.48 | $8228.10 |
8 Inch | Turbine | $4003.73 | N/A | $1800.00 | N/A | $5803.73 | $7254.66 |
8 Inch | Compound W/ Strainer | $11599.48 | N/A | $1800.00 | N/A | $13399.48 | $16749.35 |
8 Inch | Mag | $5061.73 | N/A | $1800.00 | N/A | $6861.73 | $8577.16 |
10 Inch | Turbine | $6234.73 | N/A | $2200.00 | N/A | $8434.73 | $10543.41 |
10 Inch | Mag | $6352.03 | N/A | $2200.00 | N/A | $8552.03 | $10690.04 |
12 Inch | Mag | $8724.48 | N/A | $2600.00 | N/A | $11324.48 | $14155.60 |
Tap permits are issued only with written application and approval of the City of Elyria. Time and material rates are set January 1st of the calendar year based on actual cost. Materials are an average for a normal situation. Actual fee may be different. Material prices are actual with a 15% handling fee set by ordinance. Fees do not include any special assessments or capital recovery situations set by ordinance. Taps larger than 2 inch will be performed by City approved contractors specializing in concrete mains. Taps larger than 2 inch will have all work & materials supplied by others with applicant paying all costs. | |||||||
(d) Large Water Taps.
Tap Size | Meter Size | Meter Cost | Constructi on Water | Capital Recovery Fee | Time & Materials | City Total | Outside City Total |
Tap Size | Meter Size | Meter Cost | Constructi on Water | Capital Recovery Fee | Time & Materials | City Total | Outside City Total |
3 INCH | 3 INCH TURBINE* | $929.48 | N/C | $850.00 | N/A | $1,779.48 | $2,224.35 |
4 INCH | NO METER | N/C | N/C | $1,000.00 | N/A | $1,000.00 | $1,250.00 |
4 INCH | 3-INCH COMPOUND | $2,514.4 8 | N/C | $1,000.00 | N/A | $3,514.48 | $4,393.10 |
4 INCH | 4 INCH COMPOUND | $3,636.88 | N/C | $1,000.00 | N/A | $4,636.88 | $5,796.10 |
6 INCH | NO METER | N/C | N/C | $1,400.00 | N/A | $1,400.00 | $1,750.00 |
6 INCH | 6 INCH COMPOUND | $5,182.48 | N/C | $1,400.00 | N/A | $6,582.48 | $8,228.10 |
8 INCH | NO METER | N/C | N/C | $1,800.00 | N/A | $1,800.00 | $2,250.00 |
8 INCH | COMPOUND w/Strainer | $11,599. 48 | N/C | $1,800.00 | N/A | $13,399.48 | $16,749.35 |
8 INCH | TURBINE | $4,003.73 | N/C | $1,800.00 | N/A | $5,803.73 | $7,254.66 |
8 INCH | MAG | $5,061.73 | N/C | $1,800.00 | N/A | $6,861.73 | $8,577.16 |
10 INCH | NO METER | N/C | N/C | $2,200.00 | N/A | $2,200.00 | $2,750.00 |
10 INCH | TURBINE | $6,234.73 | N/C | $2,200.00 | N/A | $8,434.73 | $10,543.41 |
10 INCH | MAG | $6,352.03 | N/C | $2,200.00 | N/A | $8,552.03 | $10,690.04 |
12 INCH | NO METER | N/C | N/C | $2,600.00 | N/A | $2,600.00 | $3,250.00 |
12 INCH | MAG | $8,724.48 | N/C | $2,600.00 | N/A | $11,324.48 | $14,155.60 |
Tap permits are issued only with written application and approval of the City of Elyria. Time and material rates are set January 1st of the calendar year based on actual cost. Materials are an average for a normal situation. Actual fee may be different. Material prices are actual with a 15% handling fee set by ordinance. Fees do not include any special assessments or capital recovery situations set by ordinance. ALL taps 4 inches and larger will be made by outside contractors with all costs paid by applicant. Tapping to be inspected by City of Elyria personnel. Contractor responsible for any and all additional permits. | |||||||
(e) City of Elyria Meter Testing.
Meter Size | In City Deposit | Outside City Deposit |
5/8 Inch | $35.00 | $40.00 |
3/4 Inch | $35.00 | $40.00 |
1 Inch | $35.00 | $40.00 |
1½ Inch | $40.00 | $60.00 |
2 Inch | $40.00 | $60.00 |
(1) Meters will be tested by request only after deposit is paid in full.
(2) Meter will be tested for American Water Works Association accuracy standards.
(3) If meter is found to be outside of the acceptable standards the deposit will be refunded in full.
(4) If meter is found to be within the acceptable standard the deposit will NOT be refunded.
(5) Meters larger than 2 inches will be sent to an independent testing facility. Deposit will be equal to actual testing costs.
(f) Hydrant Rental.
Meter Size | Meter Terminus | Rental Fee | Deposit | Total |
5/8 Inch W/Check Valve | 3/4 Inch hose bib (Sill Cock) | $65.00 | $275.00 | $340.00 |
3 Inch Fire Meter | 2½ Inch Male Fire Thread | $65.00 | $1,400.00 | $1,465.00 |
3 Inch Fire Meter | 2 Inch Male Camlock | $65.00 | $1,400.00 | $1,465.00 |
2 Inch RP Backflow Device | 2½ Inch Male Fire Thread | $35.00 | $1,400.00 | $1,435.00 |
(1) ALL fire hydrant rentals are at the discretion of the City Water Distribution Department.
(2) A permit for rental is given only in cases where such need is considered to be an absolute necessity.
(3) Rental permits are issued only with written application, approval, and payment to the City.
(4) Rental fee is for 30 days. Extensions may only be given with payment for water used and payment of new rental fee.
(5) Rental includes a meter and hydrant wrench. Rental is for ONE hydrant only.
(6) Hydrant is to be turned on fully and water controlled from the hand valve on the meter.
(7) Limited rental of backflow devices are on a first come first served basis. Unavailability of rental units does NOT relieve user's responsibility to follow State of Ohio rules and regulations for back syphonage.
(8) The hydrant meter must be protected from freezing, theft, vandalism, or other damages. Repairs will be deducted from deposit.
(9) The City reserves the right to refuse any temporary use of water if, in the opinion of the City, it is detrimental or harmful to the safety of the Public Water Supply.
(g) Meter Prices.
Size | Type | Setting | Cost | Handling Fee | Price | Lay Length |
Size | Type | Setting | Cost | Handling Fee | Price | Lay Length |
5/8 Inch | PD | INSIDE | $201.54 | 15% | $231.77 | 7.5 Inch |
PIT | $219.94 | 15% | $252.93 | 7.5 Inch | ||
PD W/BF Preventer | PRIVATE | $230.29 | 15% | $264.83 | ||
3/4 Inch | PD | INSIDE | $246.10 | 15% | $283.02 | 9 Inch |
PIT | $267.66 | 15% | $307.81 | 9 Inch | ||
PD W/BF Preventer | PRIVATE | $274.85 | 15% | $316.08 | ||
1 Inch | PD | INSIDE | $309.35 | 15% | $355.75 | 10.75 Inch |
PIT | $339.25 | 15% | $390.14 | 10.75 Inch | ||
1½ Inch | PD | INSIDE | $517.50 | 15% | $595.13 | 13 Inch |
PIT | $573.85 | 15% | $659.93 | 13 Inch | ||
2 Inch | PD | INSIDE | $664.70 | 15% | $764.41 | 17 Inch |
PIT | $719.90 | 15% | $827.89 | 17 Inch | ||
Compound | INSIDE | 15% | $0.00 | 15.25 Inch | ||
3 Inch | Turbine* | PIT | $830.00 | 15% | $954.50 | 12 Inch |
Compound | INSIDE | $2,415.00 | 15% | $2,777.25 | 17 Inch | |
MAG* | PIT | $3,145.39 | 15% | $3,617.20 | ||
Strainer | $612.50 | 15% | $704.38 | 6 Inch | ||
4 inch | Turbine | PIT | 15% | $0.00 | 14 Inch | |
Compound | INSIDE | $3,162.50 | 15% | $3,636.88 | 20 inch | |
MAG | PIT | 15% | $0.00 | |||
6 Inch | Turbine | PIT | 15% | $0.00 | 18 Inch | |
Compound | INSIDE | $3,162.50 | 15% | $3,636.88 | 24 Inch | |
Krohne MAG | PIT | $4,267.00 | 15% | $4,907.05 | ||
8 Inch | Turbine | PIT | $3,904.25 | 15% | $4,489.89 | 20 Inch |
Compound | PIT | $11,500.00 | 15% | $13,225.00 | 55 3/8" | |
Krohne MAG | PIT | $4,962.25 | 15% | $5,706.59 | 13.78" | |
10 Inch | Turbine | PIT | $6,135.25 | 15% | $7,055.54 | 26" |
Compound | PIT | 15% | $0.00 | |||
Krohne MAG | PIT | $6,252.55 | 15% | $6,252.55 | 13.78" | |
12 Inch | Turbine | PIT | OBSOLETE | $0.00 | ||
Compound | PIT | $0.00 | ||||
Krohne MAG | PIT | $8,625.00 | 15% | $9,918.75 | 19.7" | |
Individual meter prices do not include R900 transmitter add $98.48
(h) Water Pumping Plant fees:
Test
| Fee
|
Fecal coliform
| $18.00/test; lab costs for afterhours testing, not to exceed $175.00/test (cost of test and labor) |
Bacteria (MUG)
| $15.00/test; lab costs for afterhours testing, not to exceed $175.00/test (cost of test and labor)
|
Chemical tests (pH, CI2, turbidity,Alkalinity, hardness, fluoride) | $15.00/test; lab costs for afterhours testing, not to exceed $175.00/test (cost of test and labor)
|
Ortho Phosphates | $10.00/test; lab costs for afterhours testing, not to exceed $175.00/test (cost of test and labor)
|
Total Microcystins Analysis
| $75.00/test; lab costs for afterhours testing, not to exceed $175.00/test (cost of test and labor)
|
TTHM | $18.00/test; lab costs for afterhours testing, not to exceed $175.00/test (cost of test and labor)
|
(i) Utilities Department fees:
Hold-over fee $45.00
Call-out fee (Monday through Saturday) $215.00
Call-out fee (Sunday & holidays) $285.00
Service Reinstatement fee, Inside City Corp. $25.00
Service Reinstatement fee, Outside City Corp. $35.00
Nonsufficient Funds (NSF) processing $37.50
500 gallon water coupons $5.00
(Ord. 2017-20. Passed 2-21-17; Ord. 2018-102. Passed 7-9-18.)
Loading...