Skip to code content (skip section selection)
Compare to:
Dillon Overview
City of Dillon, South Carolina Code of Ordinances
DILLON, SOUTH CAROLINA CODE OF ORDINANCES
TITLE 1: GOVERNMENT AND ADMINISTRATION
TITLE 2: PUBLIC SAFETY
TITLE 3: PUBLIC WORKS
TITLE 4: PUBLIC UTILITIES
TITLE 5: PLANNING AND DEVELOPMENT
CHAPTER 1: BUILDING REGULATION AND CODE ENFORCEMENT
§ 5-1-1 CODES ADOPTED.
§ 5-1-2 ENFORCEMENT OFFICERS.
§ 5-1-3 PREVAILING ORDINANCE.
§ 5-1-4 BUSINESS LICENSE REQUIRED OF CONTRACTORS, SUBCONTRACTORS.
§ 5-1-5 COST OF BUSINESS LICENSE.
§ 5-1-6 CONTRACTORS MUST BE REGISTERED WITH SOUTH CAROLINA RESIDENTIAL BUILDERS COMMISSION.
§ 5-1-7 PROOF OF LICENSING REQUIRED.
§ 5-1-8 CITY OF DILLON CARDS.
§ 5-1-9 PROOF OF SURETY BOND.
§ 5-1-10 MORE STRINGENT REGULATIONS TO APPLY.
§ 5-1-11 CONSTRUCTION PERMITS REQUIRED.
§ 5-1-12 ZONING COMPLIANCE REQUIRED.
§ 5-1-13 ARCHITECTURAL PLANS, DESCRIPTION OF FACILITY, SITE SCHEMATIC REQUIRED.
§ 5-1-14 ROOFING, SIDING, POOL INSTALLATION REQUIRE SEPARATE PERMITS.
§ 5-1-15 TRAILERS REQUIRED TO HAVE PERMITS.
§ 5-1-16 BUILDING PERMIT FEES.
§ 5-1-17 DEMOLITION PERMITS AND FEES.
§ 5-1-18 MOVING PERMITS AND FEES.
§ 5-1-19 PLAN CHECKING FEES.
§ 5-1-20 POOL PERMITS.
§ 5-1-21 SIGN PERMITS.
§ 5-1-22 ELECTRICAL, PLUMBING AND GAS PERMITS REQUIRED.
§ 5-1-23 HOMEOWNERS MAY PERFORM WORK IN PRIMARY RESIDENCE.
§ 5-1-24 GAS LINE PRESSURE TEST REQUIRED.
§ 5-1-25 PERMIT NOT REQUIRED FOR REPLACING FIXTURES.
§ 5-1-26 BUSINESS LICENSE AND PERMIT REQUIRED FOR INSTALLATION OF LAWN SPRINKLER SYSTEMS.
§ 5-1-27 PLUMBING FEES, PERMITS.
§ 5-1-28 ELECTRICAL FEES, PERMITS.
§ 5-1-29 INSPECTIONS REQUIRED FOR PERMIT CLOSE OUT.
§ 5-1-30 TAP FEES AND UTILITY CONSTRUCTION FEES.
§ 5-1-31 ANNEXATION REQUIRED FOR ACCESS TO CITY UTILITIES.
§ 5-1-32 MISCELLANEOUS INFORMATION.
§ 5-1-33 BUILDINGS UNFIT FOR HUMAN HABITATION AND/OR USE.
§ 5-1-33.1 DEFINITIONS.
§ 5-1-33.2 INSPECTION.
§ 5-1-33.3 NOTICE OF NONCOMPLIANCE.
§ 5-1-33.4 RECORDING OF NOTICE.
§ 5-1-33.5 STANDARDS FOR COMPLIANCE.
§ 5-1-33.6 POSTING OF NOTICE TO VACATE.
§ 5-1-33.7 ALTERATIONS, REPAIRS OR REHABILITATION WORK.
§ 5-1-33.8 EXTENSION OF TIME.
§ 5-1-33.9 INTERFERENCE.
§ 5-1-33.10 BOARD OF GOVERNORS ESTABLISHED.
§ 5-1-33.11 OFFICERS.
§ 5-1-33.12 RULES OF PROCEDURES.
§ 5-1-33.13 RIGHT OF APPEAL.
§ 5-1-33.14 HEARING.
§ 5-1-33.15 FAILURE TO APPEAR.
§ 5-1-33.16 SCOPE OF HEARING.
§ 5-1-33.17 FINAL DECISION OF THE BOARD OF GOVERNORS.
§ 5-1-33.18 RECOURSE.
§ 5-1-33.19 CITY MAY DEMOLISH UNSAFE BUILDING: ASSESSMENT AGAINST PROPERTY.
§ 5-1-34 VACANT COMMERCIAL AND INDUSTRIAL BUILDING REGISTRATION.
CHAPTER 2: FAIR HOUSING
CHAPTER 3: PLANNING AND ZONING COMMISSION
CHAPTER 4: ZONING REGULATION
CHAPTER 5: LAND DEVELOPMENT REGULATIONS
CHAPTER 6: FLOOD DAMAGE PREVENTION
CHAPTER 7: ROAD NAMING AND PROPERTY ADDRESSING
CHAPTER 8: SEXUALLY ORIENTED BUSINESS
CHAPTER 9: COMPREHENSIVE PLAN
CHAPTER 10: COMMUNITY APPEARANCE STANDARDS
TITLE 6: HEALTH AND SANITATION
TITLE 7: LICENSING AND REGULATION
TITLE 8: MOTOR VEHICLES AND TRAFFIC
TITLE 9: OFFENSES
APPENDICES
PARALLEL REFERENCES
Loading...
§ 5-1-14 ROOFING, SIDING, POOL INSTALLATION REQUIRE SEPARATE PERMITS.
   Roofing, pool installation, siding installation and other similar jobs require separate permits. Be sure to check with the office before beginning such jobs. A wait is not usually required, but a permit is.
§ 5-1-15 TRAILERS REQUIRED TO HAVE PERMITS.
   Trailers are required to have building permits. A copy of the bill of sale and a plat of the property that the trailer will be placed on is required. The requirement for plat will be waived if the trailer is being placed in a trailer park.
§ 5-1-16 BUILDING PERMIT FEES.
   Building permits are based on a fee scale. The total gross cost of the job including all subcontracts will be used to factor the fee. A copy of the actual contract to construct or reliance on the Building Valuation table will be used to determine a reasonable assessment of the contract price.
Building Fee Table
Estimated Cost of Construction
Permit Fee
Building Fee Table
Estimated Cost of Construction
Permit Fee
$2,000 or less
$35
$2,001 to $15,000
$35 for the first $2,000 plus $5 for each additional thousand or fraction thereof up to $50,000
$15,001 to $50,000
$87 for the first $15,000 plus $4 for each additional thousand or fraction thereof up to $50,000
$50,001 to $100,000
$192 for the first $50,000 plus $3.50 for each additional thousand or fraction thereof up to $100,000
$100,001 to $500,000
$317 for the first $100,000 plus $3 for each additional thousand or fraction thereof up to $500,000
$500,001 and up
$1,117 for the first $500,000 plus $2.25 for each additional thousand or fraction thereof.
 
(Am. Ord. 08-16, passed 6-9-2008)
§ 5-1-17 DEMOLITION PERMITS AND FEES.
   Demolition permits are required for properties being completely removed or torn down. A fifty dollar ($50) fee will be charged for the filing and clean-up inspection of structures being demolished.
(Am. Ord. 08-16, passed 6-9-2008)
§ 5-1-18 MOVING PERMITS AND FEES.
   Moving permits are required for houses and trailers that are moved within the city limits or being moved out of the corporate limits. Permits of the South Carolina Department of Public Transportation must also be met. These permits are the responsibility of the contractor. A fifty dollar ($50) fee will be charged for moving any building or structure.
(Am. Ord. 08-16, passed 6-9-2008)
§ 5-1-19 PLAN CHECKING FEES.
    When a plan is required to be submitted, a plan-checking fee shall be paid along with the building permit fee. The plan-checking fee shall be equal to one-half of the building permit fee as based on the estimated cost of construction. There is no fee for site plan review. Residential construction exceeding five thousand (5,000) square feet require plan review.
(Am. Ord. 07-19, passed 9-10-2007)
§ 5-1-20 POOL PERMITS.
   A sixty dollar ($60) fee will be charged to cover the inspections needed for the construction and plumbing of a pool. A separate electrical permit is required.
(Am. Ord. 07-19, passed 9-10-2007; Am. Ord. 08-16, passed 6-9-2008)
Loading...