13.16.090 Catch basins – Construction.
   Catch basins shall be constructed of concrete cement or cobblestones set in cement mortar of not less than six inches in thickness or of vitrified pipe. All construction work shall be done under the supervision and to the satisfaction of the City Engineer.
(`78 Code, § 13.16.090.)